My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-06-12_REPORT - P2010015
DRMS
>
Day Forward
>
Report
>
Prospect
>
P2010015
>
2013-06-12_REPORT - P2010015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:21:23 PM
Creation date
6/13/2013 4:20:46 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2010015
IBM Index Class Name
REPORT
Doc Date
6/12/2013
Doc Name
ANNUAL FEE/REPORT
From
OPERATOR
To
DRMS
Email Name
RCO
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT IDENTIFICATION <br />Date: 25,1un -2010 <br />User : RCO <br />CIRCES Cost Estimatina Software <br />COST SUMMARY FORM <br />Permit or job no.: P- 2010 -015 Site : West Equity Project <br />Abbreviation : none State :Colorado <br />Filename:_ P015 -000 _ County :Mineral_ <br />Agency or organization name: DRMS _ <br />Permit or job action : New NOI <br />TASK <br />LIST (DIRECT COSTS) <br />TASK DESCRIPTION <br />FORM <br />USED <br />FLEET <br />SIZE <br />TASK <br />I HOURS <br />DIRECT <br />COST <br />NO. <br />001 <br />-Close and seal drill hole (1) <br />borehole <br />1 <br />8.0 <br />$4,106 <br />002 <br />- Bac�ll pad sumps (3 per pad, on 2 pads) <br />dozer <br />1 <br />0.8 <br />$71 <br />003 <br />-Pull up material for recontouring pads (2) <br />excavate <br />1 <br />5.3 <br />_ <br />$520 <br />004 <br />- Recontour grading of pad areas (2) <br />dozer <br />1 <br />6.11 <br />$492 <br />005 <br />-Pull material onto access road for recontouring <br />excavate <br />1 <br />4.1 <br />$407 <br />006 <br />- Recontour grading of access road <br />dozer <br />1 <br />5.4 <br />$440 <br />007 <br />-Rip compaction on road and pads <br />ripper <br />1 <br />4.9 <br />$410 <br />008 <br />- Respread topsoil on pads and access road <br />dozer <br />1 <br />11.6 <br />$939 <br />009 <br />- Revegetate disturbed areas (road and pads) <br />revege <br />1 <br />10.0 <br />$2,568 <br />010 <br />-Haul reclamation equipment to and from site <br />mobilize <br />1 <br />6.50 <br />$2,473 <br />E <br />SUBTOTALS 11 <br />63.0 <br />$12,426 <br />includes inflation factor adjustment of. NA % TOTAL DIRECT COST - ---F---$12,426 <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT - Liability insurance : <br />2.02 <br />% of direct <br />total = <br />$251 <br />Performance bond : <br />1.05 <br />% of direct <br />total = <br />$130 <br />Job superintendent : <br />31.54 <br />hrs * ... $/hr.- <br />$52.10 total = <br />$1,643 <br />Profit : <br />10.00 <br />% of direct <br />total = <br />$1,243 <br />assume net hours = 5011. of task hours <br />TOTAL O & P = <br />$3,267 <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT - <br />CONTRACT AMOUNT (direct + O & P) = <br />$15,693 <br />Financial warranty processing (legal /related costs) : <br />500.00 <br />total $ <br />NA total = <br />$500 <br />Engineering work and /or contract/bid preparation : <br />NA <br />NA <br />NA total = <br />NA <br />Reclamation management and /or administration : <br />5.00 <br />% of cntr. <br />NA total = <br />$785 <br />CONTINGENCY - <br />NA* <br />NA <br />total = <br />NA <br />contingencies accounted for at task level <br />TOTAL INDIRECT COST = <br />$4,552 <br />TOTAL BOND AMOUNT (direct + indirect) _ $16,978 <br />
The URL can be used to link to this page
Your browser does not support the video tag.