Laserfiche WebLink
QUARTERLY SEDIMENTATION POND INSPECTION REPORT <br />CDMR Rule 4.05.9(17) <br />Mine: New Elk Pond 6 <br />NPDES ID. No.: <br />Inspection Period <br />Inspection Date: <br />None <br />Second Quarter 2013 <br />06/07/13 <br />General Description or Reference to Site Plan: <br />Pond 6 is a non - discharging facility designed to contain plant processing water. The plant has <br />been idle since 1996 and the pond is now used to dewater other ponds prior to clean -out. <br />EMBANKMENT <br />1). Adequacy of the vegetative cover: <br />2). Erosion forming Gullies: <br />3). Is wave action causing erosion: <br />On the Upstream embankment? <br />Excellent Moderate "e Poor <br />Extensive Some (is) None <br />Yes <br />4). Erosion of the downstream toe of the embankment? Yes <br />Cause of erosion can be attributed to: <br />5). Is seepage occurring through the dam? Yes <br />Could this seepage cause potential instability? <br />SEDIMENT STORAGE CAPACITY <br />1). Has the design storage capacity of the reservoir been surpassed? <br />Yes <br />Explain: <br />OTHER OBSERVATIONS: <br />� <br />MSHA Qualified lmpoundment"Inspector <br />Ln=,,] )-o J3 <br />Datt' <br />No (1- <br />No L- <br />No I,— <br />No L—' <br />