My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-06-07_REVISION - C2009087
DRMS
>
Day Forward
>
Revision
>
Coal
>
C2009087
>
2013-06-07_REVISION - C2009087
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:21:18 PM
Creation date
6/13/2013 7:23:47 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2009087
IBM Index Class Name
Revision
Doc Date
6/7/2013
Doc Name
Proposed Decision Letter & Form
From
DRMS
To
Peabody Sage Creek Mining, LLC
Type & Sequence
TR6
Email Name
JDM
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF COLORADO <br />DIVISION OF RECLAMATION, MINING AND SAFETY <br />Department of Natural Resources <br />1313 Sherman St., Room 215 <br />Denver, Colorado 80203 <br />Phone: (303) 866 -3567 <br />FAX: (303) 832 -8106 <br />June 7, 2013 <br />B. Scott Cowman <br />Peabody Sage Creek Mining, LLC <br />P.O. Box 250 <br />36600 Routt County Road 27 <br />Hayden, CO 81639 -0250 <br />Re: Peabody Sage Creek Mine (Permit No. C- 2009 -087) <br />Proposed Decision - Technical Revision No. 6 (TR -6) <br />Bond Reduction <br />Dear Mr. Co-,ti man: <br />COLORADO <br />ID IV I S I O N O F <br />RECLAMATION <br />MINING <br />SAFETY <br />John W. Hickenlooper <br />Governor <br />Mike King <br />Executive Director <br />Loretta E. Pineda <br />Director <br />Enclosed you will find the Division of Reclamation, Mining and Safety's Proposed Decision for Technical Revision <br />No. 6 at the Peabody Sage Creek Mine. Notice of the proposed decision will be published in the Steamboat Pilot as <br />soon as possible. The first publication will initiate the ten (10) day public comment period for the Division's <br />decision. <br />Documentation must be submitted to the Division demonstrating that a copy of the approved revision application <br />was sent to the Office of Surface Mining and the Bureau of Land Management. The material should be sent within <br />15 days of final approval. <br />Please refer to the Performance Bond heading on the enclosed proposed decision form. If the amount of Bond Held <br />equals or exceeds the Revised Liability, you need not submit additional bond. However, if the Revised Liability <br />exceeds the Bond Held, please submit additional bond or rider to your existing bond that equals or exceeds the <br />Revised Liability. This Technical Revision must not be implemented until this proposed decision becomes final and <br />until any required increase in bond is submitted to and approved by the Division. <br />If there are stipulations attached, please sign and return the proposed decision form to the Division. <br />If you have any questions, please contact me. <br />Sincerely, <br />Jason D. Musick <br />Environmental Protection Specialist <br />Jason.musick @state.co.us <br />Enclosure <br />cc: Jeffrey W. Fleischman, Office of Surface Mining, with enclosures <br />Office of Office of <br />Mined Land Reclamation Denver • Grand Junction • Durango Active and Inactive Mines <br />
The URL can be used to link to this page
Your browser does not support the video tag.