My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-06-07_INSPECTION - M1989023
DRMS
>
Day Forward
>
Inspection
>
Minerals
>
M1989023
>
2013-06-07_INSPECTION - M1989023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/16/2022 11:06:44 AM
Creation date
6/11/2013 3:45:41 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1989023
IBM Index Class Name
Inspection
Doc Date
6/7/2013
Doc Name
INSPECTION REPORT
From
DRMS
To
OPERATOR
Email Name
BMK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 1 of 2 <br />BULLDOZER WORK <br />Task description: Apply topsoil <br />Site: Caliche School Pit Permit Action: Amendment Permit/Job#: M1989023 <br />PROJECT IDENTIFICATION <br />Task #: 002 <br />Date: 6/712013 <br />User: BMK <br />State: Colorado <br />County: Logan <br />Agency or organization name <br />HOURLY EQUIPMENT COST <br />Basic Machine: <br />Horsepower: <br />Blade Type: <br />Attachment: <br />Shift Basis: <br />Data Source: <br />Cost Breakdown: <br />Cat D9T - 9SU <br />405 <br />Semi - Universal <br />1 -shank ripper <br />1 per day <br />(CRG) <br />DRMS <br />Abbreviation: None <br />Filename: M023 -002 <br />Total unit Cost/Hour: $267.47 <br />Total Fleet Cost/Hour: $267.47 <br />MATERIAL QUANTITIES <br />Initial Volume: <br />6,437 <br />Utilization % <br />Ownership Cost/Hour: <br />$78.51 <br />NA <br />Operating Cost/Hour: <br />$142.13 <br />100 <br />Ripper op. Cost/Hour: <br />$9.41 <br />100 <br />Operator Cost/Hour: <br />$37.41 <br />NA <br />Total unit Cost/Hour: $267.47 <br />Total Fleet Cost/Hour: $267.47 <br />MATERIAL QUANTITIES <br />Initial Volume: <br />6,437 <br />Swell factor: <br />1.000 <br />Loose volume: <br />6,437 LCY <br />Dozing method: 1.200 <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly production <br />250 feet <br />546.0 LCY/hr <br />Materials consistency description: Partly consolidated stockpile 1.1 <br />Average push gradient: <br />Average site altitude: <br />Material weight: <br />Weight description: <br />0% <br />3,800 feet <br />1,600 lbs/LCY <br />Soil <br />Job Condition Correction Factor <br />Source <br />Operator Skill: 0.750 <br />(AVG.) <br />Material consistency: 1.100 <br />(CAT HB) <br />Dozing method: 1.200 <br />(SLOT) <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.