My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-06-07_INSPECTION - M1989023
DRMS
>
Day Forward
>
Inspection
>
Minerals
>
M1989023
>
2013-06-07_INSPECTION - M1989023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/16/2022 11:06:44 AM
Creation date
6/11/2013 3:45:41 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1989023
IBM Index Class Name
Inspection
Doc Date
6/7/2013
Doc Name
INSPECTION REPORT
From
DRMS
To
OPERATOR
Email Name
BMK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task description: <br />Site: Caliche School Pit <br />PROJECT IDENTIFICATION <br />COST SUMMARY WORK <br />Permit Action: Amendment Permit/Job#: M1989023 <br />Task #: 005 State: Colorado <br />Date: 6/7/2013 County: Logan <br />User: BMK <br />Agency or organization name: DRMS <br />TASK LIST (DIRECT COSTS) <br />Abbreviation: None <br />Filename: M023 -005 <br />Task <br />Description <br />Form <br />Used <br />Fleet <br />Size <br />Task <br />Hours <br />Cost <br />001 <br />002 <br />003 <br />004 <br />cut high wall slopes to 3 :1 <br />DOZER <br />1 <br />1 <br />1 <br />1 <br />41.32 <br />$10,983.37 <br />$2,965.25 <br />$6,160.18 <br />$536.66 <br />apply topsoil <br />DOZER <br />11.09 <br />reve a 9.5 acres <br />REVEGE <br />0.00 <br />mob/ demob <br />MOBILIZE <br />0.22 <br />SUBTOTALS: <br />52.63 <br />$20,645.46 <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT: <br />Liability insurance: 2.02% <br />Total = <br />$417.04 <br />Performance bond: 1.05% <br />Total = <br />$216.78 <br />Job superintendent: 0.00 hrs <br />Total = <br />$0.00 <br />Profit: 10.00% <br />Total = <br />$2,064.55 <br />TOTAL O & P = <br />$2,698.37 <br />CONTRACT AMOUNT (direct + O & P) = <br />$23,343.83 <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT: <br />Financial warranty processing (legal /related costs): <br />500.00 <br />Total = <br />500.00 <br />Engineering work and /or contract/bid preparation: <br />0.00% <br />Total = <br />$0.00 <br />Reclamation management and /or administration: <br />5.00% <br />$1,167.19 <br />CONTINGENCY: <br />3.00 <br />Total = <br />$619.36 <br />TOTAL INDIRECT COST = $4,984.93 <br />TOTAL BOND AMOUNT (direct + indirect) = $25,630.39 <br />
The URL can be used to link to this page
Your browser does not support the video tag.