My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-06-07_INSPECTION - M1989023
DRMS
>
Day Forward
>
Inspection
>
Minerals
>
M1989023
>
2013-06-07_INSPECTION - M1989023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/16/2022 11:06:44 AM
Creation date
6/11/2013 3:45:41 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1989023
IBM Index Class Name
Inspection
Doc Date
6/7/2013
Doc Name
INSPECTION REPORT
From
DRMS
To
OPERATOR
Email Name
BMK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 1 of 2 <br />EQUIPMENT MOBILIZATION/DEMOBILIZATION <br />Task description: Mob/ demob <br />Site: Caliche School Pit Permit Action: Amendment Permit/Job#: M1989023 <br />PROJECT IDENTIFICATION <br />Task #: 004 State: Colorado <br />Date: 6/712013 County: Logan <br />User: BMK <br />Agency or organization name: DRMS <br />EQUIPMENT TRANSPORT RIG COST <br />Abbreviation: None <br />Filename: M023 -004 <br />Shift basis: 1 per day <br />Cost Data Source: CRG Data <br />Truck Tractor Description: GENERIC ON- HIGHWAY TRUCK TRACTOR, 6X4, DIESEL POWERED, <br />400 HP (2ND HALF, 2006) <br />Truck Trailer Description: GENERIC FOLDING GOOSENECK, DROP DECK EQUIPMENT TRAILER <br />(25T, 50T, AND 100T) <br />Cost Breakdown: <br />Available Rig Capacities <br />0 -25 Tons <br />26 -50 Tons <br />51+ Tons <br />Ownership Cost/Hour: <br />$16.63 <br />$18.37 <br />$22.33 <br />Operating Cost/Hour: <br />$44.38 <br />$46.13 <br />$50.07 <br />Operator Cost/Hour: <br />$27.66 <br />$27.66 <br />$27.66 <br />Helper Cost/Hour: <br />$0.00 <br />$25.39 <br />$25.39 <br />Total Unit Cost/Hour: <br />$88.67 <br />$117.55 <br />$125.45 <br />NON ROADABLE EQUIPMENT: <br />Machine <br />Weight/ <br />Owner ship <br />Haul Rig <br />Fleet <br />Haul Trip <br />Return Trip <br />DOT Permit <br />Description <br />Unit <br />Cost/hr/ unit <br />Cost/hr /unit <br />Size <br />Cost/hr/ <br />Cost/hr/ fleet <br />Cost/ fleet <br />(TONS) <br />fleet <br />Cat D9T - 9SU <br />60.01 <br />$69.88 <br />$125.45 <br />1 <br />$195.33 <br />$125.45 <br />$250.00 <br />Subtotals: 1 $195.33 1 $125.45 1 $250.00 <br />ROADABLE EOUIPMENT: <br />Machine Description Total Cost/hr/ unit Fleet Size Haul Trip Return Trip <br />Cost/hr/ fleet Cost/hr/ fleet <br />Subtotals: $0.00 $0.00 <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.