My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-06-07_REVISION - M1977215
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977215
>
2013-06-07_REVISION - M1977215
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:21:18 PM
Creation date
6/11/2013 3:15:25 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977215
IBM Index Class Name
REVISION
Doc Date
6/7/2013
Doc Name
TR-22 APPROVAL
From
DRMS
To
OPERATOR
Type & Sequence
TR22
Email Name
RCO
GRM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pagel of 3 <br />TRUCK/LOADER TEAM WORK <br />Task description: Haul topsoil up to 9400 WRSF to respread <br />Site: Bulldog Mine Operation Permit Action: TR -22 Permit/Job #: M1977215 <br />PROJECT IDENTIFICATION <br />Task #: 008 State: Colorado <br />Date: 6/7/2013 County: Mineral <br />User: RCO <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Truck Loader Team - Truck: Cat 730 <br />- Loader: CAT 938H <br />Support Equipment -Load Area: <br />-Dump Area: <br />Road Maintenance —Motor Grader: <br />-Water Truck: <br />Cast Rreakdnwn: Tnick/i.nnrier Team <br />NA <br />NA <br />NA <br />NA <br />Abbreviation: None <br />Filename: M215 -008 <br />Shift basis: 1per day <br />sigh lift <br />Rnnnnrt Frniinmant <br />NiTaintananra Fmiinm ant <br />Total work team costihour: $345.19 <br />MATERIAL OUANTITIES <br />Initial volume: 7,744 CCY Swell factor: 1.125 <br />Loose volume: 8,712 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00 <br />HOURLY PRODUCTION <br />Truck Capacity: <br />Truck Payload (weight) Basis: <br />Material weight: 2,550 Pounds/LCY <br />Description: Earth - Dry packed <br />Rated Payload: 62,000 Pounds <br />Payload Capacity: 24.31 LCY <br />CIRCES Cost Estimating Software <br />Truck <br />Loader <br />Load Area <br />Dump Area <br />Motor Grader <br />Water Truck <br />%Utilization- machine: <br />100 <br />100 <br />NA <br />NA <br />NA <br />NA <br />Ownership cost/hour: <br />$34.49 <br />$21.45 <br />NA <br />NA <br />NA <br />NA <br />Operating cost/hour: <br />$64.95 <br />$37.75 <br />NA <br />NA <br />NA <br />NA <br />Ripper op. cost/hour: <br />NA <br />$0.00 <br />NA <br />NA <br />NA <br />NA <br />Operator cost/hour: <br />$25.66 <br />$35.82 <br />NA <br />NA <br />NA <br />NA <br />Unit Subtotals: <br />$125.09 <br />$95.01 <br />NA <br />NA <br />NA <br />NA <br />Number of Units: <br />2 <br />1 <br />0 <br />0 <br />0 <br />0 <br />Group Subtotals: <br />Work: $345.19 <br />Support: $0.00 <br />Maint: $0.00 <br />Total work team costihour: $345.19 <br />MATERIAL OUANTITIES <br />Initial volume: 7,744 CCY Swell factor: 1.125 <br />Loose volume: 8,712 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00 <br />HOURLY PRODUCTION <br />Truck Capacity: <br />Truck Payload (weight) Basis: <br />Material weight: 2,550 Pounds/LCY <br />Description: Earth - Dry packed <br />Rated Payload: 62,000 Pounds <br />Payload Capacity: 24.31 LCY <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.