My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-06-07_REVISION - M1977215
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977215
>
2013-06-07_REVISION - M1977215
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:21:18 PM
Creation date
6/11/2013 3:15:25 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977215
IBM Index Class Name
REVISION
Doc Date
6/7/2013
Doc Name
TR-22 APPROVAL
From
DRMS
To
OPERATOR
Type & Sequence
TR22
Email Name
RCO
GRM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 1 of 2 <br />BULLDOZER WORK <br />Task description: Replace topsoil on vent raise access road <br />Site: Bulldog Mine Operation Permit Action: TR -22 Permit/Job #: M1977215 <br />PROJECT IDENTIFICATIOl\ <br />Task #: 004 <br />Date: 6/7/2013 <br />User: RCO <br />State: Colorado <br />County: Mineral <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: <br />Cat D9T - 9SU <br />Horsepower: <br />405 <br />Blade Type: <br />Semi - Universal <br />Attachment: <br />3 -shank ripper <br />Shift Basis: <br />1 per day <br />Data Source: <br />(CRG) <br />Cost Breakdown: <br />Abbreviation: None <br />Filename: M215 -004 <br />Total unit Cost/Hour: $257.87 <br />Total Fleet Cost/Hour: $257.87 <br />MATERIAL QUANTITIES <br />Source <br />Utilization % <br />Ownership Cost/Hour: <br />$78.33 <br />NA <br />Operating Cost/Hour: <br />$142.13 <br />100 <br />Ripper op. Cost/Hour: <br />$0.00 <br />0 <br />Operator Cost/Hour: <br />$37.41 <br />NA <br />Total unit Cost/Hour: $257.87 <br />Total Fleet Cost/Hour: $257.87 <br />MATERIAL QUANTITIES <br />Source <br />Initial Volume: <br />500 <br />Swell factor: <br />1.000 <br />Loose volume: <br />500 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Average push distance: 50 feet <br />Unadjusted hourly production: 2,110.5 LCY/hr <br />Materials consistency description: Loose stockpile 1.2 <br />Average push gradient: <br />Average site altitude: <br />Material weight: <br />Weight description: <br />0% <br />9.700 feet <br />0 lbs/LCY <br />Earth - Dry packed <br />Job Condition Correction Factor <br />Source <br />Operator Skill: 0.750 <br />(AVG.) <br />Material consistency: 1.200 <br />CAT HB <br />Dozing method: 1.000 <br />GEN.) <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.