My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-06-06_REPORT - M1980244
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2013-06-06_REPORT - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:21:15 PM
Creation date
6/11/2013 12:53:01 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
6/6/2013
Doc Name
Weekly CQA Reports: 5/11/13, 5/18/13, & 5/25/13.
From
CC&V
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
T L W I I Ab <br />An Amec field representative monitored structural fill material temperatures placed within the Phase I Squaw Gulch <br />VLF and the Hwy 67 embankment during all shifts. Average structural fill temperatures were above 32 °F <br />Secondary Underdrain: <br />No work was performed on the Secondary underdrain during this reporting period. <br />A total of 1380 feet of Secondary underdrain has been completed. <br />Primary Underdrain: <br />No work was performed on the Primary underdrain during this reporting period. <br />A total of 1280 feet of Primary underdrain has been completed. <br />Underdrain Ponds: <br />Concrete for the underdrain Ponds are complete, no other work was performed. <br />Field inspections and field concrete testing results meet all requirements as specified. <br />Tree /Slash Clearing, Chipping: <br />Seed Masters resumed chipping stockpiled trees and slash during this reporting period. Chipping is expected to <br />continue. One "Chipper" and two CAT 330 excavators were in operation. <br />B) Underground Workings <br />Confirmatory drilling continued during the reporting period on UG Working No. 06136. All drill locations were <br />spaced on 4( + / -) foot centers and drilled to specified depth. Exploratory excavation will continue until remediation <br />has been performed. <br />During this reporting period no exploratory excavation was performed. <br />During this reporting period no remediation efforts were performed. <br />C) Highway 67 <br />MHT #2 is in place and is working properly. Highway 67 embankment fill continued during this reporting period. <br />II) Storm Water Management <br />Best Management Practices (BMP) are being performed. <br />C A ACTIVITIES: <br />1) Field Activities: Construction activities and observation of clearing and grubbing, VLF Phase I fill and compaction, <br />underground workings, HWY 67 embankment fill placement, were some of the field tasks performed during this reporting <br />period as required per project specifications. <br />H) Laboratory Activities: Laboratory testing continued (Permeability, Particle Size Distribution, Atterberg Limits, <br />Moisture- Density, gradations and material identifications) and material sampling were some of the laboratory testing <br />performed during this reporting period as required. <br />General Proiiect Items <br />Page 2 of 6 MLE2 WE 05.25.13.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.