My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-06-06_REPORT - M2003030
DRMS
>
Day Forward
>
Report
>
Minerals
>
M2003030
>
2013-06-06_REPORT - M2003030
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/7/2018 3:49:30 PM
Creation date
6/11/2013 12:50:09 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2003030
IBM Index Class Name
REPORT
Doc Date
6/6/2013
From
Joseph L. Dorris
To
DRMS
Permit Index Doc Type
Annual Fee/Report
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Reclamation Accomplished During 2012: <br />No reclamation was accomplished during 2012. <br />On 18 May, we planted 30 aspen, 25 chokecherry, 30 ponderosa, and 30 Douglas fir on Site B. <br />Additionally, reseeded with native mix. Due to drought, regrowth is quite slow. Tree survival is 85 <br />percent. <br />Roads have not been removed. They provide access for Sites A and C that are still being mined. <br />All other sites under this permit except Site C which is open for operations and Site B with a portion <br />of Site A which is less than one year reclaimed, are at 80 percent regrowth and considered <br />complete. <br />Proposed 2013 Operations: <br />Operations will be in conjunction with operations on T. D. Minerals claims, Quist claims, and <br />Crystaljack mining claims between early June through the end of July and be conducted primarily <br />using a John Deer 992 and/or 690 track hoe. Operations on the Smoky Hawk will extend Site C to <br />the southwest corner. Site D will be opened with a portion remaining open after making it safe for <br />winter. <br />Site visits, including mineral extraction, reclamation, and claim maintenance will be continued <br />throughout the season. <br />Anticipated 2013 Disturbances: <br />Approximately 0.5 acre will be opened on the Smoky Hawk at Site C and D. Approximately 0.2 <br />acre will be reclaimed and reseeded. <br />Any additional prospects will not exceed 0.1 acre. <br />Proposed 2013 Reclamation: <br />Approximately 30 ponderosa pine, 25 chokecherry, and 60 aspens will be further planted on Sites A <br />and B on the Smoky Hawk. Additional reseeding will be accomplished on areas that are not <br />showing good growth. <br />Any test pits that may be opened during 2012 will be filled, recontoured, and reseeded. <br />
The URL can be used to link to this page
Your browser does not support the video tag.