Laserfiche WebLink
• Page 2 <br />Sub Total Cost $ 1,248.00 <br />Total Due spray project: $ 601.60 <br />July 9, 2012 <br />Total due for the current spray program is $ 601.50 Chemical Usage and hour <br />chart are reflected by Location Chart which is included. If you have any questions <br />please call. <br />Sincere) <br />Kim Ekstrom, Owner <br />Bill Ekstrom, Evergreen <br />Qualified Supervisor #04566 <br />Evergreen Weed Control <br />