Laserfiche WebLink
DRILL HOLE INFORMATION FORM <br /> Kennecott Energy-Colowyo Mine <br /> Project:Colowyo Collom 2006 Exploration Hole ID: C-06-10 <br /> Colowyo Project Manager Juan Garcia Hole Type(pilot,spot core,full core,well,geotech,etc) PILOT <br /> Geologist(Company) M Neville Date Hole Started 1/23/2006 Date Hole Finished 1/24/2005 <br /> Eas4ng. 1328111 01 Northing. 351723,61 i Ground Elevation- F389 28 J TD 901 <br /> Location(Qtr/Qtr,Section,T&F SE/NW of Section 35,T4N,R94W Depth of Weathering 23 <br /> County and State Moffat,CO Coordinate Type Colowyo Surveyed(y/n) yes <br /> Drilling: <br /> Drilling Company Western American On Rig Type: Gradener Denver 140 Driller Steve Klein <br /> Surface Casing Type&Size 6"pvc Interval Depths <br /> Other Casing Runs Interval Depths <br /> Casing Recovered(y/n) <br /> Drilling Methods* Hole&Core <br /> Rotary or Core From To Diameter Bit Type Ream Interval <br /> 0 20 7 7/8" 20 <br /> 20 901 55/8 881 <br /> Drilling Medium <br /> From To Medium and Additives <br /> 0 20 Air <br /> 20 901 Air,Water/Soap Mix <br /> Circulation&Hole Problems(depth lost,regained,etc) <br /> Logging: <br /> Logging Company Century Geopysical Logger Name Robert Sipes Probe Depth 9006 <br /> Date Hole Logged 1/24/2006 Logging Suite Gamma,Density,Caliper,Resitivity,,Deviation,Temp <br /> Digital Log Format LAS Other <br /> Sampling&Testing <br /> Sampling Information(cuttings frequency,spot coring,etc) 5'cuttings for descriptions only <br /> Coal Laboratory <br /> Overburden Laboratory <br /> Gas Testing <br /> Geomechanical Testing. <br /> Hole Completion &Reclamation <br /> Date Hole Plugged 1/2512006 Date Site Reclaimed <br /> Backfill Materials and Depths bentonite plug gel/pellets <br /> Number of bags used 18/32 Hole Marking Information <br /> Surface Reclamation <br /> Groundwater <br /> Static water Level(Log) Inflow(depth&production estimates) Water initially encountered at—150 <br /> ft with a steady rate of increase below.A major surge of inflow was encountered <br /> at the Km At or below this point inflow was estimated at 30 to 40 gpm <br /> Well Installation Details <br /> Comments <br /> Completion—form xis Page of <br />