My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-04-10_PERMIT FILE - C1981019 (78)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981019
>
2013-04-10_PERMIT FILE - C1981019 (78)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:19:22 PM
Creation date
6/10/2013 1:50:44 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Permit File
Doc Date
4/10/2013
Doc Name
Geology Pre-Feasibility Report
Section_Exhibit Name
Volume 17 Exhibit 6 Item 7
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
287
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Collom Area Geology Pre - Feasibility Report <br />5.0 Resource Area Targeting and Margin Rank Studies <br />Extensive coal resources exist in and around the Colowyo Mine Area (West <br />Pit) and the CMA. As a result, Colowyo has performed several projects to <br />assist in locating the most favorable mining areas. <br />5.1 Colowyo Cost Ranking Study <br />In 2003, Colowyo performed an internal review of potential mining targets <br />across the Colowyo properties. This study is known as the "Cost Ranking <br />Study ". This study outlined the CMA as the most favorable for mine <br />development and outlined the Collom Mine Phases 1, 2, 3 and 4. The Collom <br />Phase 1 & 2 Mine areas drove the scope of the 2004 Exploration Program, <br />however, Phases 3 and 4 were also drilled to expand the geological database <br />across the Collom Resource Area. The Collom Phase 1 & 2 areas have since <br />been renamed the Collom Mine Area (CMA). <br />5.2 Geological Resource Review <br />In early 2005, the <br />Collom Exploration <br />Team reviewed the entire <br />Colowyo <br />geological model to <br />identify areas of <br />potential future short -term <br />resource <br />development. This <br />review consisted <br />of identifying 13 different <br />locations <br />across the Colowyo properties with varying mining potential. Colowyo and <br />the Collom Exploration Team consider most of the areas highlighted as long- <br />term resources. However, the Collom Exploration Team highlighted six <br />potential areas for additional study. <br />The Geological Resource Review highlighted the following short -term <br />resource targets: <br />• Lower Wilson I -Seam area for development by highwall miner and <br />continuous miner development. <br />• South Taylor surface mining to the E2 seam <br />August 2005 Page 17 of 38 <br />
The URL can be used to link to this page
Your browser does not support the video tag.