My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-04-10_PERMIT FILE - C1981019 (82)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981019
>
2013-04-10_PERMIT FILE - C1981019 (82)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:19:23 PM
Creation date
6/10/2013 10:04:04 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019A
IBM Index Class Name
Permit File
Doc Date
4/10/2013
Doc Name
Operation and Reclamaiton Plans
Section_Exhibit Name
Volume 15 Rule 2.05
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RULE 2 PERMITS <br />seeding in this area are in the early spring and late fall. Spring seeding is usually severely limited by high <br />soil moisture conditions, which prohibit the use of seeding and seedbed preparation equipment at a time <br />when conditions are best for germination and seedling establishment. For this reason seeding will <br />primarily be done during late fall months immediately prior to the average occurrence of the first <br />significant snowfall event when the conditions for seeding are optimal. A modest amount of broadcast <br />seeding may occur at other times including early spring, as detailed under Planting and Seeding Methods <br />in this Section, but typically only for small "mop -up" circumstances. <br />Given the significant and nearly ubiquitous past failures regarding the establishment of shrubs on <br />Coloywo's reclamation areas, the only proven technique for use in the Collom area is direct seeding of <br />these species, which has demonstrated some success historically at the existing operation. Previous <br />alternative shrub - establishment methods, specifically the use of containerized saplings and live local <br />transplants will not be incorporated into the greater strategy for large scale shrub establishment efforts. <br />However, at CDOW's request, Colowyo has agreed to randomly incorporate approximately 750 small (36 <br />square foot) exclosures into future reclamation areas at a density of approximately five exclosures per <br />acre on 150 acres. The specific locations of these exclosures will be identified on the subsequent Annual <br />Reclamation Report Map following their implementation each year. These exclosures will contain <br />tublings (containerized stock) of serviceberry and chokecherry to ensure there is a presence of these <br />species on the greater reclamation surface. These exclosures will be fenced to prevent predation by <br />wildlife and the surface of the exclosures will be covered by weedguard fabric to reduce competition from <br />other plant species. While there is no specific performance criteria associated with these exclosures, they <br />will be monitored periodically via interim revegetation monitoring efforts with the goal that at least one <br />tubling per exclosure survives until the reclamation area it is contained within is released from liability <br />through the Phase III Bond Release process. Protective fencing will be removed immediately prior to or <br />immediately after Phase III Bond Release is granted as directed by DRMS staff at the time. Additional <br />efforts such as adding snow fencing near exclosures can be implemented if it is determined extra moisture <br />is necessary to help establish the tubling serviceberry and chokecherry plantings. <br />With regard to out of pit road embankments, where possible, road cut slopes will be reduced from 1:1 to <br />3h:ly, retopsoiled, seeded, and mulched. Cut and fill slopes will likely be left in a roughened condition <br />during construction, and then topsoiled, mulched and seeded post construction. Please refer to the <br />construction notes on Map 25E Sheet 3 of 9 for additional details regarding stabilization methods. The <br />seed mixture to be utilized for road cut outslope stabilization can be observed in Section 4.03.2 of this <br />application. Species were chosen to ensure rapid establishment and sediment control. <br />Upon the completion of all coal mining and reclamation operations by Colowyo in the Collom Area, the <br />office, shop, coal crushing facilities and other related surface facilities will be removed and the sites <br />reclaimed according to the grading, topsoil and revegetation procedures set forth in this plan, providing <br />there are no continuing beneficial uses for these structures. <br />Reclaimed areas will be appropriately fenced, if necessary, to manage grazing or browsing by livestock or <br />wildlife. With regard to shrub establishment areas, the design is to provide sufficient seed for the <br />development of more than adequate populations. If it is determined that marginal populations evolve and <br />warrant protection, or excessive damage (severe hedging) to those populations is noted, those areas of <br />sufficient size (e.g., 10 acres and larger) or sufficiently proximal to each other, may be fenced with elk - <br />proof fencing at the discretion of Colowyo's reclamation coordinator. This practice would occur to <br />ensure that reclamation would meet the established success criteria. <br />Planting and Seeding Methods <br />Collom —Rule 2, page 116 Revision Date: 9/28/11 <br />Revision No.: PR -03 <br />
The URL can be used to link to this page
Your browser does not support the video tag.