Laserfiche WebLink
TABLE OF CONTENTS <br />2.05.3 (4) <br />Operation Plan — Ponds, Impoundments, and Diversions ............. .............................98 <br />2.05.3 (5) <br />Topsoil ........................................................................................... .............................99 <br />2.05.3 (6) <br />Overburden .................................................... ............................... ............................100 <br />2.05.3 (7) <br />Coal Handling Structures ............................... ............................... ............................103 <br />2.05.3 (8) <br />Coal Mine Waste and Non -Coal Processing Waste ...................... ............................103 <br />2.05.3 (9) <br />Return of Coal Mine Waste to Abandoned Workings .................. ............................104 <br />2.05.4(l) <br />Reclamation Plan ........................................... ............................... ............................104 <br />2.05.4 (2)(a) <br />Reclamation Timetable .................................. ............................... ............................105 <br />2.05.4 (2)(b) <br />Reclamation Costs ......................................... ............................... ............................105 <br />2.05.4 (2)(c) <br />Backfilling Plan ............................................. ............................... ............................105 <br />2.05.4 (2)(d) <br />Topsoil Salvage ............................................. ............................... ............................105 <br />2.05.4 (2)(e) <br />Reclamation Revegetation ............................. ............................... ............................110 <br />2.05.4 (2)(f -h) <br />Disposal, Mine Openings, Water and Air Control ........................ ............................120 <br />2.05.5 <br />Post - Mining Land Uses ................................. ............................... ............................122 <br />2.05.6 <br />Mitigation of Surface Mining Operation Impacts Air Pollution Control Plan .........123 <br />2.05.6(l) <br />Air Pollution Contol Plan .............................. ............................... ............................123 <br />2.05.6 (2) <br />Fish and Wildlife Plan ................................... ............................... ............................126 <br />2.05.6 (3)(a) <br />Protection of the Hydrologic Balance ............ ............................... ............................131 <br />2.05.6 (3)(b)(i & <br />ii) Hydrologic Controls ....................................... ............................... ............................132 <br />2.05.6 (3)(b)(iii) <br />Probable Hydrologic Consequences .............. ............................... ............................132 <br />2.05.6 (4) <br />Protection of Public Parks and Historic Places ............................. ............................143 <br />2.05.6 (5 -6) <br />Surface Mining near Underground Mining; Subsidence Control . ............................143 <br />2.06 <br />PERMIT REQUIREMENTS - SPECIAL MINING CATEGORIES ..........................144 <br />2.06.1 -3 <br />Scope, Experimental Mining, and Mountain Top Removal ......... ............................144 <br />2.06.4 <br />Steep Slope Mining ........................................ ............................... ............................144 <br />2.06.5 <br />Variance from Approximate Original Contour Restoration Requirements ..............144 <br />2.06.6 <br />Prime Farmlands ............................................ ............................... ............................144 <br />2.06.7 <br />Reclamation Variance .................................... ............................... ............................144 <br />2.06.8 <br />Alluvial Valley Floor (AVF) ......................... ............................... ............................144 <br />2.06.9 — 2.06.11 <br />Augering, Processing Plants, In -Situ Processing .......................... ............................148 <br />2.06.12.1 <br />Coal Refuse Piles ........................................... ............................... ............................148 <br />2.07-2.10 <br />VARIOUS ......................................................... ............................... ............................148 <br />RULE3 — PERFORMANCE BOND .............................................................................. ..............................1 <br />RULE 4 — PERFORMANCE STANDARDS ................................................................. ..............................1 <br />4.02 <br />SIGNS AND MARKERS ................................................................. ..............................1 <br />4.02.1 <br />Specifications ................................................................................. ............................... <br />l <br />4.02.2 <br />Mine and Permit Identification Signs ............................................. ..............................1 <br />4.02.3 <br />Perimeter Markers .......................................................................... ..............................1 <br />4.02.4 <br />Duration of Maintenance ................................................................ ..............................1 <br />4.02.5 <br />Stream Buffer Zone Markers .......................................................... ..............................1 <br />4.02.6 <br />Blasting Signs ................................................................................. ..............................1 <br />4.02.7 <br />Topsoil Markers .............................................................................. ..............................1 <br />4.03 <br />ROADWAYS ................................................................................... ..............................2 <br />4.03.1 <br />Haul Roads ..................................................................................... ..............................2 <br />4.03.2 <br />Access Roads .................................................................................. ..............................2 <br />4.03.3 <br />Light -Use Roads ............................................................................. ..............................3 <br />4.04 <br />SUPPORT FACILITIES ................................................................... ..............................3 <br />4.05 <br />HYDROLOGIC BALANCE ............................................................ ..............................3 <br />4.05.1 <br />General Requirements .................................................................... ..............................3 <br />4.05.2 <br />Water Quality Standards and Effluent Limitations ......................... ..............................5 <br />4.05.3 <br />Diversions and Conveyance of a Watershed Less than One Square Mile ....................5 <br />Collom -ii Revision Date: 9/28/11 <br />Revision No.: PR -03 <br />