Laserfiche WebLink
RECLAMATION COST ESTIMATE <br />Assumptions include that work will be performed using an excavator 312 Caterpillar or <br />equivalent, a Caterpillar Model 212 grader, or equivalent, wheel loader sized at 2 cubic yards or <br />greater, 12 -yard dump truck, and a 4 -Trax with harrow for covering seed. It is also assumed that <br />the equipment and contractor is located within 20 miles of project. <br />Sanere de Christo Tunnel Area <br />Removal of mining equipment and temporary structures (cost = worth) $ 00 <br />Closure of portal and installation of frame and gate $ 3,500 <br />Removal of refuse and debris $ 500 <br />Removal of MSHA mandated road berms and regrading of roads (500 ft at $2 /ft) $ 1,000 <br />Air Raise Area <br />Closure of Air Raise (Installation of concrete plug, fill and cover) $ 4,500 <br />Grade and smooth surface seed and finish $ 500 <br />Miscellaneous <br />Seed and finish 1.0 acres at $2,000 /acre $ 2,000 <br />Mob/Demob $ 1,000 <br />SUBTOTAL $13,000 <br />Contingency (10%) $ 1,400 <br />TOTAL COST $14,300 <br />(Rounded to nearest $100) <br />