Laserfiche WebLink
615/13 State.co.uus E)ecOve Branch Mail - Fwd: NOI X- 2013 - 228-01 ReWsed Access Roads <br />Frorm Musick - DNR, Jason [ mailto :jason.musick @state.co.us] <br />Sent: Tuesday, June 04, 2013 9:37 AM <br />To: Koontz, Wendell <br />Cc: Alysha Hernandez - DNR; Mary Rodriguez - DNR <br />Subject: Re: NOI X- 2013 - 228 -01 Revised Access Roads <br />Good morning Wendell, <br />Thank you for the submittal of the revised access road map. One question I have is the access to site SST-1. <br />The previous map identified access to SST-1 from both SST-6 and SST-5. The revised map does not identify the <br />access to SST-1 not the length of road to SST-1. Please clarify if the access to SST-1 will be from SST-6 or <br />SST-5 and the proposed length of the road. <br />Thanks, <br />Jason <br />On Mon, Jun 3, 2013 at 12:33 PM, Koontz, Wendell <WKoontz @archcoal.com> wrote: <br />Jason <br />As directed by and in coordination with the USFS we have field verified and revised the access roads for the 2013 <br />exploration drilling. These revisions better fit the lay of the land and minimize surface disturbance. This exercise <br />was necessary this spring so that thwe did not make decisions prior to the completion of the leasing action. I <br />attach a map of the revised alignments to supplement the Exploration Plan. <br />Major changes are noted as an additional 0.01 total acres of disturbance (13.96 vs 13.95 acres) on USFS lands <br />and an additional 0.03 acres of disturbance on Arch Coal property (0.66 vs 0.63 acres). <br />Please let me know if you have any questions. <br />Thanks <br />Wendell <br />Wendell A. Koontz <br />https: // mail. google. corrVmail/ u/0/?ui= 2&jIFe29129fcb5&Wev&=pt& search= inbox&th= 13fl48a8c292lcA4 214 <br />