Laserfiche WebLink
Page S of S <br />b. Please verify the volumes of both topsoil and coverfill actually stockpiled at the <br />site and clearly identify where this material is located. Please provide volumes <br />for each stockpile. <br />C. Please provide an accurate map depicting where topsoil has been replaced and <br />the depth of topsoil replacement in each area. <br />6. DRMS: Please update Map 32, Topsoil Distribution Plan, to include the proposed <br />disturbance area associated with the gob pile expansion. <br />BRL: Please see revised Map 32. <br />DRMS: This map will lil<ely need to be revised again when BRL responds to Item 5a, above, <br />and further modifies the topsoil redistribution plan. Please either update Map 32 to <br />reflect the currently proposed plan or verify that the April 29, 2013 version is accurate. <br />If you have any questions or need additional information, please contact me. <br />Sincerely, <br />Susan L. Burgmaier <br />Environmental Protection Specialist <br />cc: Tamme Bishop, J.E. Stover & Associates <br />Jared Ebert, DRMS <br />