My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-05-30_REPORT - M1984036
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1984036
>
2013-05-30_REPORT - M1984036
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/7/2018 3:50:27 PM
Creation date
6/3/2013 7:49:39 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1984036
IBM Index Class Name
REPORT
Doc Date
5/30/2013
From
Varra Companies, Inc.
To
DRMS
Permit Index Doc Type
Annual Fee/Report
Email Name
PSH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
112c Annual Report <br />Permittee Name: <br />Varra Companies, Inc. <br />Permit Number: <br />M1984 -036 <br />Operation Name: <br />Varra Resources Project 110 <br />County: <br />Weld <br />Annual Fee Due: <br />$ 791.00 <br />Anniversary Date: <br />30 April 1994 <br />Permit Acreage: <br />120.00 <br />Current Bond Amt: <br />$ 87,200.00 <br />According to C.R.S. 34- 32.5 -116 or 34 -32 -116, each year, on the anniversary date of the permit, an operator shall submit <br />the annual fee, an annual report and map showing the extent of current disturbances to affected land, required monitoring <br />information, reclamation accomplished to date and during the preceding year, any new disturbance that is anticipated to <br />occur during the upcoming year, any reclamation that will be performed during the upcoming year, the dates for the <br />beginning of active operations, and the date active operations ceased for the year, if any. <br />Information contained in this report will be reviewed by the Division upon receipt and prior to the next compliance <br />inspection of the site. If, while completing this report, you learn that your site is not in compliance with the rules and the <br />act, it is advisable that the issues be rectified promptly to avoid possible enforcement action. <br />SUMMARY NARRATIVE: The permit was revised by Technical Revision (20 10) and Amendment (2011) that typifies <br />the remaining fill, site prep, reclamation, and warranty circumstances at play over the permitted lands. Approved <br />reservoirs have had their perimeter's graded, soiled and seeded in prior reporting years, with principle activity directed in <br />the northeast portion of the location with generalized grading and fill focused upon an existing basin, now reduced to apx. <br />2.0± acres from the previously reported 2.38± acres, as shown on the updated map. Weeds are predominantly white top, <br />an annual that is mechanically controlled along seeded slopes of reservoir perimeters as needed. Water level data is also <br />included as an attachment to this report. Primary future activity includes the continued processing and removal of <br />stockpiles, and filling of the shown basin. We anticipate the completion of fill activity in 2013 -14, however, no other <br />reclamation is anticipated for the 2013 -2014 year. <br />1. Is the site identification sign posted in accordance with Rule 3.1.12(1) <br />2. Is the affected area boundary clearly marked in accordance with Rule 3.1.12(2) <br />3. Is the mine site in final reclamation (all material extraction and stockpile removal is complete)? <br />If "YES," please note time limits related to completion of reclamation, Rule 3.1.3. <br />4. What was the date of last excavation, processing or hauling activity at the mine? <br />5. Does the mine operate more or less than 180 days per year? <br />If "LESS ", please review Rule 1.13 to assure that your mine is in compliance. <br />6. Has this mine been granted: a) approval of TEMPORARY CESSATION Status? <br />b) approval for INTERMITTENT OPERATION? <br />7. Number of acres currently affected (mining + incomplete and or unreleased reclamation) <br />*Refer to 2011 Amendment. <br />8. Number of acres that were newly affected during the current report year. <br />9. Number of acres that were reclaimed during the current report year. <br />10. Estimated new acreage to be affected in the next report year. <br />11. Estimated acres to be reclaimed in the next report year. <br />YES NO <br />YES NO <br />YES NO <br />On -going <br />MORE LESS <br />YES NO <br />YES NO <br />*ALL <br />-0- <br />_n- <br />_n_ <br />-0- <br />
The URL can be used to link to this page
Your browser does not support the video tag.