Laserfiche WebLink
2013 -05 -14 08:21 DRMS 3038328106 >> 308 254 3455 <br />110c Annual Report <br />Permittce Name: Nienitucser Construction & Permit Number: M -2001 -018 <br />rxcayating Co <br />Operation Narnc: Schumacher II County_ Logan <br />Annual Fee Due. $323.00 Anniversary Date: April 19, 2013 <br />1'errrtil Acreage: 9.90 Current Bond Arttt: S8,8UU.00 <br />P 2/3 <br />Page 2 of 3 <br />J <br />According to C.R.S. 34 -32.5 -116 or 34-32-116, each year, on the anniversary date of the permit, an operator shall submit <br />the Annual Fee, an Annual Report and Map showing the extent of current disturbances to affected land, required <br />monitoring information, reclamation accomplished to date and during the preceding year, any new disturbance that is <br />anticipated to occur during the upcoming year, any reclamation that will be performed during the upcoming year, the <br />dates for the beginning of active operations, and the date active operations ceased for the year. <br />Information contained in this Mort will he reviewed by the Division upon receipt and prior to the next compliance <br />inspection of the site. If, while completing this report, you learn that your site is not in compliance with the rules and the <br />act, it is advisable that the issues be rectified promptly to avoid possible enforcement action. <br />1. Is the site identification sign posted in accordance with Rule 3.1.12(1), <br />YES NO <br />2, is the affected area boundary clearly marked in accordance with Rule 3.1.12(2). <br />YES NO <br />3 Is the nurse site in final reclamation (all material extraction and stockpile removal is comploteyl YES NO <br />If "YES," please note time limits related to completion of reclamation, Rule 3.1.3. <br />4. What was the date of last excavation, processing or hauling activity at the mine? <br />5. Does the mine operate more than 180 days per year? <br />YrS NO <br />If "NO", please review Rule 1.13 to assure that your mine is in compliance. <br />6. Has this mitre been granted: a) approval of "TEMPORARY CESSATION Status? <br />YES NO <br />b) approval for TNTf:RIv11TTENT OPERATION? <br />IJS NO <br />7. Number of acres currently affected (mining -- incomplete and or unreleased reclamation). <br />8_ Number of acres that were newly affected during the current report year. <br />9. Number of acres that were reclaimed during the current report year. <br />10. Estimated new acreage to be affected in the next report year. <br />_ .7-6— <br />11. Estimated acres to be reclaimed in the next report year_ <br />12. Total acres in various sta es of reclamation, since pen <br />Total acres Total acres <br />backfilled: seeded w/ <br />a roved mix: <br />Total acres Total acres <br />graded: fertilized w/ D <br />apvd fertilizer: <br />Seed I Fertilizer <br />application application <br />method: D method <br />itted ttuning activities began: t <br />Total acres Total acres <br />w /topsoil n mulched w/ <br />replaced: C.J approved mulch: D <br />Topsoil Mulch application <br />replacement O I rate (tons /ac): <br />depth (in.): Lo <br />Mulch <br />application Q <br />y method: J <br />