Laserfiche WebLink
6.4.5 Exhibit E — Reclamation Plan <br />10. Please revise Map F -1, as- needed, to be consistent with your response to previous comment 7. <br />No map changes were required. <br />6.4.6 Exhibit F — Reclamation Plan Map <br />12. Page 30 of the May 20 submittal (page 29 of the original submittal) references cross - sections on <br />Maps F -2 and C -3 which have not been submitted. DRMS recognizes the references to cross - <br />sections may be a relic. If they are a relic, then please remove the references from page 30 and <br />submit a revised copy of that page. <br />The page in question has been revised, and replacement pages have been attached. <br />13. Our original comment was: On map F -1, there are two pink lines. The thicker pink line appears to <br />be the proposed permit boundary, but it is not clear what the thinner pink line (in the southeast <br />area) represents. Please clarify. The copy of map F -1 provided in the May 20 submittal shows a <br />thin pink line at a different location than shown on the original map. It is still not clear what this line <br />represents. Please submit a copy of Map F -1 which clearly indicates what the pink line represents. <br />This unnecessary line has been removed. See the revised Map F -1. <br />20. New comment. Please provide a copy of the gravel pit water well permit when it becomes <br />available. <br />According to Joanna Williams of the Colorado Division of Water Resources, the gravel well <br />permit will be issued in early June. A copy will be provided to DRMS as soon as it is approved. <br />21. New comment.- DRMS is evaluating the reclamation cost estimate for the site and will provide you <br />the results when the evaluation is complete. <br />Comment understood. <br />Please contact Greg Lewicki and Associates if you have any further adequacy comments or <br />questions. <br />Sincerely, <br />Ben Langenfeld, P.E. <br />