EXTENSI ON OF TI M E FOR ABATEM ENT NOTI CE
<br />FOR NOTICE OF VIOLATION OR CESSATION ORDER FOR COAL OPERATION
<br />TO: THE OPERATOR AND PERMITTEE OF THE MINE DESCRIBED BELOW
<br />Cessation Order No.
<br />Date NOV or CO
<br />Issued:
<br />Mine:
<br />Operator (If Other
<br />than Permittee):
<br />M ai I Address:
<br />NA
<br />M ay 16, 2013
<br />Bowie No. 2 Mine
<br />Same
<br />Same
<br />Notice of Violation No. CV- 2013 -004
<br />Permit No.: C- 1996 -083
<br />County:
<br />Type of M i ne:
<br />Per m i ttee:
<br />Mail Address:
<br />Delta
<br />Underground/ Federal
<br />Bowie Resourcess, L L C
<br />P.O. Box 483
<br />Paonia CO 81428
<br />In Notice of Violation No. CV- 2013 -004, the deadli ne for Step 1 abatement of the practice, condition
<br />or violation described was fixed at June 28, 2013, and Step 3 was fixed at June 30, 2013.
<br />It is hereby found that the operator has failed to abate such practice, condition or violation, or cannot
<br />complete abatement within the time al lowed, but that such failure is not due to lack of diligence on the
<br />part of the operator. The ti me for abatement is therefore extended to July 31, 2013 for Steps 1 and 3.
<br />The conditions, practices or violation as to which this extension applies areas follows:
<br />Extension of Ti me for Abatement Steps:
<br />1. Place and compact all existing end- dumped material on Gob Pile #2 in accordance with the Rules
<br />and approved per m i t appl i cat on package no I ater than Jul y 31, 2013.
<br />3. Conduct quarterly i nspections of Gob Pi le #2 i n accordance with ad I of the requi rem ents of Rule
<br />4.10.2, beginning with the second quarter or 2013; submit the second quarter report to the
<br />Division no later than July 31, 2013.
<br />DIVISION OF RECLAMATION, MINING AND SAFETY
<br />Date of Issue: May 31, 2013
<br />By: �a,.,`
<br />(Signature of Authorized Representative) [Signature of Division Director, if extension is beyond 90 days,
<br />Susan L. Burgmaier pursuant to Rule 5.03.2(2)(e)]. The Division'sjustification for
<br />Environmental Protection Specialist approving the extension beyond 90 days is attached.
<br />COLORADO DIVISION OF RECLAMATION, MINING AND SAFETY
<br />I[ €Cfe#M.4TIC1N
<br />MIN�i 1JG
<br />1313 Sherman Street, Room 215, Denver, Colorado 80203, (303) 866 -3567
<br />SAf fTY
<br />EXTENSI ON OF TI M E FOR ABATEM ENT NOTI CE
<br />FOR NOTICE OF VIOLATION OR CESSATION ORDER FOR COAL OPERATION
<br />TO: THE OPERATOR AND PERMITTEE OF THE MINE DESCRIBED BELOW
<br />Cessation Order No.
<br />Date NOV or CO
<br />Issued:
<br />Mine:
<br />Operator (If Other
<br />than Permittee):
<br />M ai I Address:
<br />NA
<br />M ay 16, 2013
<br />Bowie No. 2 Mine
<br />Same
<br />Same
<br />Notice of Violation No. CV- 2013 -004
<br />Permit No.: C- 1996 -083
<br />County:
<br />Type of M i ne:
<br />Per m i ttee:
<br />Mail Address:
<br />Delta
<br />Underground/ Federal
<br />Bowie Resourcess, L L C
<br />P.O. Box 483
<br />Paonia CO 81428
<br />In Notice of Violation No. CV- 2013 -004, the deadli ne for Step 1 abatement of the practice, condition
<br />or violation described was fixed at June 28, 2013, and Step 3 was fixed at June 30, 2013.
<br />It is hereby found that the operator has failed to abate such practice, condition or violation, or cannot
<br />complete abatement within the time al lowed, but that such failure is not due to lack of diligence on the
<br />part of the operator. The ti me for abatement is therefore extended to July 31, 2013 for Steps 1 and 3.
<br />The conditions, practices or violation as to which this extension applies areas follows:
<br />Extension of Ti me for Abatement Steps:
<br />1. Place and compact all existing end- dumped material on Gob Pile #2 in accordance with the Rules
<br />and approved per m i t appl i cat on package no I ater than Jul y 31, 2013.
<br />3. Conduct quarterly i nspections of Gob Pi le #2 i n accordance with ad I of the requi rem ents of Rule
<br />4.10.2, beginning with the second quarter or 2013; submit the second quarter report to the
<br />Division no later than July 31, 2013.
<br />DIVISION OF RECLAMATION, MINING AND SAFETY
<br />Date of Issue: May 31, 2013
<br />By: �a,.,`
<br />(Signature of Authorized Representative) [Signature of Division Director, if extension is beyond 90 days,
<br />Susan L. Burgmaier pursuant to Rule 5.03.2(2)(e)]. The Division'sjustification for
<br />Environmental Protection Specialist approving the extension beyond 90 days is attached.