Laserfiche WebLink
EXTENSI ON OF TI M E FOR ABATEM ENT NOTI CE <br />FOR NOTICE OF VIOLATION OR CESSATION ORDER FOR COAL OPERATION <br />TO: THE OPERATOR AND PERMITTEE OF THE MINE DESCRIBED BELOW <br />Cessation Order No. <br />Date NOV or CO <br />Issued: <br />Mine: <br />Operator (If Other <br />than Permittee): <br />M ai I Address: <br />NA <br />M ay 16, 2013 <br />Bowie No. 2 Mine <br />Same <br />Same <br />Notice of Violation No. CV- 2013 -004 <br />Permit No.: C- 1996 -083 <br />County: <br />Type of M i ne: <br />Per m i ttee: <br />Mail Address: <br />Delta <br />Underground/ Federal <br />Bowie Resourcess, L L C <br />P.O. Box 483 <br />Paonia CO 81428 <br />In Notice of Violation No. CV- 2013 -004, the deadli ne for Step 1 abatement of the practice, condition <br />or violation described was fixed at June 28, 2013, and Step 3 was fixed at June 30, 2013. <br />It is hereby found that the operator has failed to abate such practice, condition or violation, or cannot <br />complete abatement within the time al lowed, but that such failure is not due to lack of diligence on the <br />part of the operator. The ti me for abatement is therefore extended to July 31, 2013 for Steps 1 and 3. <br />The conditions, practices or violation as to which this extension applies areas follows: <br />Extension of Ti me for Abatement Steps: <br />1. Place and compact all existing end- dumped material on Gob Pile #2 in accordance with the Rules <br />and approved per m i t appl i cat on package no I ater than Jul y 31, 2013. <br />3. Conduct quarterly i nspections of Gob Pi le #2 i n accordance with ad I of the requi rem ents of Rule <br />4.10.2, beginning with the second quarter or 2013; submit the second quarter report to the <br />Division no later than July 31, 2013. <br />DIVISION OF RECLAMATION, MINING AND SAFETY <br />Date of Issue: May 31, 2013 <br />By: �a,.,` <br />(Signature of Authorized Representative) [Signature of Division Director, if extension is beyond 90 days, <br />Susan L. Burgmaier pursuant to Rule 5.03.2(2)(e)]. The Division'sjustification for <br />Environmental Protection Specialist approving the extension beyond 90 days is attached. <br />COLORADO DIVISION OF RECLAMATION, MINING AND SAFETY <br />I[ €Cfe#M.4TIC1N <br />MIN�i 1JG <br />1313 Sherman Street, Room 215, Denver, Colorado 80203, (303) 866 -3567 <br />SAf fTY <br />EXTENSI ON OF TI M E FOR ABATEM ENT NOTI CE <br />FOR NOTICE OF VIOLATION OR CESSATION ORDER FOR COAL OPERATION <br />TO: THE OPERATOR AND PERMITTEE OF THE MINE DESCRIBED BELOW <br />Cessation Order No. <br />Date NOV or CO <br />Issued: <br />Mine: <br />Operator (If Other <br />than Permittee): <br />M ai I Address: <br />NA <br />M ay 16, 2013 <br />Bowie No. 2 Mine <br />Same <br />Same <br />Notice of Violation No. CV- 2013 -004 <br />Permit No.: C- 1996 -083 <br />County: <br />Type of M i ne: <br />Per m i ttee: <br />Mail Address: <br />Delta <br />Underground/ Federal <br />Bowie Resourcess, L L C <br />P.O. Box 483 <br />Paonia CO 81428 <br />In Notice of Violation No. CV- 2013 -004, the deadli ne for Step 1 abatement of the practice, condition <br />or violation described was fixed at June 28, 2013, and Step 3 was fixed at June 30, 2013. <br />It is hereby found that the operator has failed to abate such practice, condition or violation, or cannot <br />complete abatement within the time al lowed, but that such failure is not due to lack of diligence on the <br />part of the operator. The ti me for abatement is therefore extended to July 31, 2013 for Steps 1 and 3. <br />The conditions, practices or violation as to which this extension applies areas follows: <br />Extension of Ti me for Abatement Steps: <br />1. Place and compact all existing end- dumped material on Gob Pile #2 in accordance with the Rules <br />and approved per m i t appl i cat on package no I ater than Jul y 31, 2013. <br />3. Conduct quarterly i nspections of Gob Pi le #2 i n accordance with ad I of the requi rem ents of Rule <br />4.10.2, beginning with the second quarter or 2013; submit the second quarter report to the <br />Division no later than July 31, 2013. <br />DIVISION OF RECLAMATION, MINING AND SAFETY <br />Date of Issue: May 31, 2013 <br />By: �a,.,` <br />(Signature of Authorized Representative) [Signature of Division Director, if extension is beyond 90 days, <br />Susan L. Burgmaier pursuant to Rule 5.03.2(2)(e)]. The Division'sjustification for <br />Environmental Protection Specialist approving the extension beyond 90 days is attached. <br />