Laserfiche WebLink
SENECA II -W RILL & GULLY SURVEY — 2013 <br />The following areas were observed in April and May as needing repair and/or maintenance. <br />North Entrance Road <br />• Road ditch across from Pond 005 needs riprap repair <br />• 005 Gulch channel at property fence below Stock Pond T -18 needs additional rock <br />• 005 Gulch, at a location between property fence and T -18, needs additional rock <br />North Area — 005 Channel <br />• Inlet to T -18 needs additional rock <br />• Channel 005 -E1 needs additional rock at junction with 005 Gulch <br />• Ridgeline Access road - install additional 12" culvert across road above 005 Gulch <br />culvert <br />• Add additional drainage network below new 12" culvert to control runoff <br />• Re- topsoil and add additional drainage network to a small area above the Ridgeline <br />Access road just west of 005 Gulch <br />006 Channel Area <br />• Channel 006 -NE 1 — needs repaired above Oil Well road <br />• Channel 006 -NE2 — located on east side of oil well pad. Needs repaired <br />Pond 016 Drainage Area <br />• Channel PM -2A — diagonal drainage entering toward the upper end was breached and <br />needs repair. <br />• Gully forming thru upper aspen plot above Stockpond T -26 <br />• Need to design a culvert for low water crossing at bottom of PM 2 to access monitoring <br />wells. <br />