Laserfiche WebLink
YOAST RILL & GULLY SURVEY — 2013 <br />The following areas were observed in April and May as needing repair and/or maintenance. <br />Old Facilities Area <br />• Reseed "parking area" <br />North Pit <br />• Repair portions of PM -13 between surge ponds <br />• Add fabric around trees in SP3 shrub plot area <br />Neck Pit Area <br />• 2010 Shrub Plot has rills /gullies to be repaired <br />• East side of PM -11 has small rill /gully to be repaired <br />• South end of Shrub Plot SP7 -1 needs fence repair and TRM repair <br />• YPM 8 needs TRM repair <br />South Area <br />• Repair channel erosion and install gabions in various areas <br />• Reclaim roads and topsoil stockpile area following completion of topsoiling at Pond 012 <br />