Laserfiche WebLink
RIDER TO MINING PERMIT <br />Permit Date: April 4, 2012 <br />Permit No: C -1996 -083 <br />The following additional stipulations form an integral part of the foregoing permit: <br />Stipulation No. <br />Description <br />26 No coal waste can be transported to Coal Waste Pile <br />No. 3 until necessary construction permits are <br />obtained from the DCPHE and received at the <br />Division. <br />29 Prior to placement of cover on the eastern portion of <br />Gob Pile #4, BRL must survey the eastern portion of <br />the pile to verify that slopes are not steeper than 2:1 <br />and regrade any slopes as necessary to ensure <br />conformity with the approved slope design. <br />Documentation of the corrected slopes must be <br />submitted to and approved by the Division before <br />cover can be placed on the eastern portion of the <br />disposal area. The area to be surveyed and regraded <br />is depicted on the February 8, 2013 review drawing <br />submitted with the Technical Revision No. 75 <br />application. <br />ACCEPTED AND AGREED: DIVISION OF RECLAMATION, MINING & <br />SAFETY COLORADO DEPARTMENT OF <br />NATURAL RESOURCES <br />B �' y�6 i7 <br />Operator itle Division Director <br />AG Alpha No. NR LR TYB <br />AG File No. PNR/3928 /JD <br />C -RN -18 <br />