Laserfiche WebLink
Parcel Z -A -12 <br />Point <br />Post Mine Topo <br />TR111 Map <br />Difference Ft. <br />May -13 <br />Correction <br />Corrected <br />Difference <br />Elevation Ft. <br />Elevation Ft. <br />GPS <br />Factor <br />Elevation <br />Transect 8 <br />A <br />7500.00 <br />7507.00 <br />-7.00 <br />7464.47 <br />47.50 <br />7511.97 <br />4.97 <br />Transect8 <br />B <br />7550.00 <br />7548.40 <br />1.60 <br />7514.38 <br />48.50 <br />7562.88 <br />14.48 <br />Transect 8 <br />C <br />7550.00 <br />7544.00 <br />6.00 <br />7498.31 <br />49.50 <br />7547.81 <br />3.81 <br />Transect8 <br />D <br />7500.00 <br />7515.60 <br />-15.60 <br />7469.69 <br />50.50 <br />7520.19 <br />4.59 <br />Transect8 <br />E <br />7450.00 <br />7464.70 <br />-14.70 <br />7417.32 <br />51.50 <br />7468.82 <br />4.12 <br />Transect8 <br />F <br />7400.00 <br />7400.00 <br />0.00 <br />7352.84 <br />52.50 <br />7405.34 <br />5.34 <br />7600.00 <br />7550.00 <br />7500.00 <br />LL <br />0 7450.00 <br />M <br />m <br />a 7400.00 <br />W <br />7350.00 <br />7300.00 <br />Post Mine Topography; Parcel Z -A -12; <br />Transect 8 <br />A B C D E F <br />Page 8 of 8 <br />tMap M12; Post Mining <br />Topography <br />-11-2012 ARR Topo <br />-* -May Inspection Elevation <br />