Laserfiche WebLink
Table 11 <br />L.G. Everist South Platte River Gravel Pits Summary <br />January 2012 to December 2013 SWSP Accounting <br />(all values in acre -feet, unless otherwise noted) <br />(2) (3) 4) <br />NET DEPLETIONS <br />Month <br />Ft Lupton <br />Lupton <br />Meadows <br />Total Mining <br />Depletions <br />Percent <br />of Month <br />with Call <br />Out -of- <br />Priority Net <br />Depletion <br />Jan -12 <br />-6.75 <br />-6.15 <br />-12.90 <br />100% <br />-12.90 <br />Feb-12 <br />-6.17 <br />-5.67 <br />-11.84 <br />100% <br />-11.84 <br />Mar -12 <br />-5.85 <br />-5.42 <br />-1127 <br />100% <br />-11.27 <br />Apr-12 <br />-5.64 <br />-6.84 <br />-12.48 <br />100% <br />-12.48 <br />May-12 <br />-5 48 <br />-6.72 <br />-12.20 <br />100% <br />-12.20 <br />Jun -12 <br />-5.45 <br />-7.48 <br />-12.93 <br />100% <br />-12.93 <br />Jul -12 <br />-5.39 <br />-720 <br />-1259 <br />100% <br />-12.69 <br />Aug-12 <br />-5.17 <br />-6.94 <br />-12.11 <br />100% <br />-12.11 <br />Sep-12 <br />-4.74 <br />-7.59 <br />-1233 <br />100% <br />-12.33 <br />Oct -12 <br />-4.26 <br />-606 <br />-1034 <br />100% <br />-10.34 <br />Nov -12 <br />-3.79 <br />-5,10 <br />-8.89 <br />100% <br />-8.89 <br />Dec -12 <br />-3.28 <br />-2.26 <br />-5.54 <br />100% <br />-5.54 <br />TOTAL 2012 <br />-61.97 <br />-73.42 <br />- 135.39 <br />- 135.39 <br />Jan-13 <br />-2.91 <br />-1.49 <br />4.40 <br />100% <br />X AO <br />Feb-13 <br />-2.80 <br />- 2.03 <br />4.83 <br />100% <br />-4.83 <br />Mar -13 <br />-2.79 <br />-256 <br />-5.35 <br />100% <br />-5.35 <br />Apr-1 3 <br />-2.83 <br />-4.61 <br />-7.44 <br />100% <br />-7.44 <br />May-13 <br />-2.90 <br />496 <br />-7.86 <br />100% <br />-7.88 <br />Jun -13 <br />-3.04 <br />-611 <br />-915 <br />100% <br />-8.15 <br />Jul -13 <br />-3.15 <br />-613 <br />-9.28 <br />100% <br />-9.28 <br />Au -13 <br />1 -3.09 <br />-611 <br />-9.20 <br />100% <br />-9.20 <br />Sep-1 3 <br />-2.81 <br />-7.01 <br />-9.82 <br />100% <br />-9.82 <br />Oct -13 <br />-2.47 <br />-5.62 <br />-8.09 <br />100 % <br />-8,09 <br />Nov -13 <br />-2.12 <br />-4.74 <br />-6.86 <br />100% <br />-8.86 <br />Dec-13 <br />-1.73 <br />-1.92 <br />-3.65 <br />100% <br />-3.85 <br />TOTAL 2013 1 <br />-32,64 <br />- 53.26 <br />-85.90 <br />-8590 <br />(7) (8) 91 <br />REPLACEMENTS <br />Person Responsible for this plan <br />Lynn Mayer Shulls <br />303.286.2247 <br />(1D) <br />Lupton Bottom <br />Ditch <br />Depletions <br />Rinn Valley <br />Phase 3 Pit <br />Deliveries <br />Rinn Valley <br />Phase 3 Pd <br />Transit Losses <br />Rinn Valley <br />Phase 3 Pit <br />Credits <br />Laramie -Fox <br />Hill Well <br />Pum m <br />000 <br />1326 <br />-036 <br />12.90 <br />447 <br />0.00 <br />12 17 <br />-033 <br />11 84 <br />000 <br />11.58 <br />-0.32 <br />11.27 <br />9.68 <br />2.88 <br />-0.08 <br />2.80 <br />10.27 <br />15.81 <br />4.48 <br />3.71 -0,10 3.60 <br />17.99 <br />10.70 -0.29 10.40 <br />-0.44 <br />4.20 -0.12 4.09 <br />2043 <br />60.31 <br />37,10 -1.02 36.08 <br />0.00 <br />13.01 <br />11.33 <br />1.03 <br />-0,03 <br />100 <br />4.48 <br />6.02 <br />-017 <br />5.85 <br />-354 <br />1278 <br />-0.35 <br />1243 <br />-0.44 <br />6.15 <br />-0.17 <br />5.98 <br />88.76 <br />65.87 <br />-1,81 <br />64 06 <br />0.00 <br />000 <br />4.52 -0,12 4.40 <br />0 00 <br />4.96 -0.14 483 <br />-0.44 <br />5.95 -0.16 5.79 <br />447 <br />3.06 -0,08 2.97 <br />804 <br />11.16 <br />16.05 <br />10.27 <br />10.27 <br />4.48 <br />3.71 -0,10 3.60 <br />-3.54 <br />10.70 -0.29 10.40 <br />-0.44 <br />4.20 -0.12 4.09 <br />60.31 <br />37,10 -1.02 36.08 <br />0.00 <br />ti 1) <br />RIVER <br />BALANCE <br />0.00 <br />coo <br />000 <br />0,00 <br />361 <br />5.06 <br />785 <br />091 <br />coo <br />0.00 <br />0.00 <br />0.00 <br />1743 <br />0.00 <br />000 <br />0.00 <br />0.00 <br />019 <br />201 <br />6,77 <br />1 07 <br />0.44 <br />0.00 <br />000 <br />0.00 <br />10.49 <br />Notes <br />1. See Table 9, Column (14). <br />2. See Table 10, Column (14) <br />3 Equal to(1) +(2). <br />4. Percent of month with call placed downstream of pits based on Water Division 1 records. - Accounting values based on actual recorded calls. <br />5. Equal to (3) • (4). Negative values ( -) represent net depletions to river system. Positive values ( +) represent net accretions to river system. <br />6. Historical lagged depletions associated with dry up of land under Lupton Bottom Ditch associated with recorded augmentation station deliveries of 1 share(s) in 2012 and 1 shares) in <br />2013 summarized in Table 12, Return flow obligations (negative values) are multiplied by portion of month with call (4). <br />7. Based on reusable supplies stored in lined Phase 3 cell at Rinn Valley. L.G. Evenst's total use of Phase 3 Pit releases summarized in Table 12. <br />8. Based on transit loss over 10.98 miles to South Platte River confluence at wnnler loss rate of 0.25% per mile. <br />9. Equal to (7) + (8). <br />10. Pumping from one or more of L.G. Evenct's Laramie -Fox Hill wells (WDIDs 0210211, 0210212, and 0210213) <br />11. Equal to (5) + (6) + (9) + (10). Negative values ( -) represent net depletions to river system, Positive values ( +) represent net accretions to nver system. <br />. .mnswv....uw..,,•w,w.,,,,..rnii mn rw+n.«.. <br />w..,� i.we ti.k ..w •i,.ro,i � i... <br />