My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-05-29_HYDROLOGY - M1996052
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M1996052
>
2013-05-29_HYDROLOGY - M1996052
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:20:53 PM
Creation date
5/30/2013 7:46:46 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1996052
IBM Index Class Name
HYDROLOGY
Doc Date
5/29/2013
Doc Name
SWSP
From
OSE
To
Parsons Water Consulting, LLC
Permit Index Doc Type
Hydrology Report
Email Name
ECS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table 8 <br />L.G. Everist St. Wain Gravel Pits Summary <br />January 2012 to December 2013 SWSP Accounting <br />(all values in acre -feet, unless otherwise noted) <br />(1t (2) (3) (4) (51 (6) <br />Jan -13 <br />-1.98 <br />-095 <br />NET DEPLETIONS <br />-3 47 <br />100% <br />Month <br />Lohmann <br />Rinn Valley <br />Firestone <br />Total <br />Percent <br />of Month <br />vath Call <br />Out -of- <br />Priority Net <br />Depletion <br />Jan -12 <br />-7.38 <br />-10.54 <br />-0.54 <br />-18.46 <br />100% <br />-18.46 <br />Feb -12 <br />-7.55 <br />-7.09 <br />-027 <br />-14.91 <br />100% <br />714.91 <br />Mar -12 <br />-5.25 <br />-5.24 <br />-0.26 <br />-10.75 <br />100% <br />-10.75 <br />Apr-1 2 <br />-5 23 <br />-604 <br />-0.65 <br />-11.92 <br />100% <br />-11.92 <br />May-12 <br />-4 35 <br />-5.51 <br />-1.13 <br />-10.99 <br />100% <br />1 -10.99 <br />Jun -12 <br />4.49 <br />-6.95 <br />-1.71 <br />-13.14 <br />100% <br />-13.14 <br />Jul -12 <br />-3.B0 <br />-6.31 <br />-2.37 <br />-1248 <br />100% <br />-12.48 <br />Aug-12 <br />-3,64 <br />-5.75 <br />-2.78 <br />-12.17 <br />100% <br />-12.17 <br />se 12 <br />.391 <br />-5.30 <br />-269 <br />-11.90 <br />100% <br />-11.90 <br />00-12 <br />-310 <br />-3.52 <br />-2.21 <br />-8.83 <br />100% <br />-8.83 <br />Nov -12 1 <br />-3.22 <br />-3.23 <br />-1.61 <br />-8.06 <br />100% <br />-8.08 <br />Dec -12 <br />-2.31 <br />-1.22 <br />-1.06 <br />-459 <br />100 % <br />-4.59 <br />TOTAL 2012 1 <br />-54.23 <br />-56.69 <br />-17.28 <br />- 138.20 <br />- 138.20 <br />Jan -13 <br />-1.98 <br />-095 <br />-0.54 <br />-3 47 <br />100% <br />-3.47 <br />Feb-13 <br />-2.95 <br />-2.29 <br />-027 <br />-5.51 <br />100% <br />-5.51 <br />Mar -13 <br />-1.29 <br />- 2.01 <br />.0.26 <br />-3.56 <br />100% <br />-3.56 <br />Apr-13 <br />-1.81 <br />-3.86 <br />-0.65 <br />-6.32 <br />100% <br />-6.32 <br />May-13 <br />-1 41 <br />-405 <br />-1.13 <br />-6.59 <br />100 % <br />-6.59 <br />Jun -13 <br />-1.96 <br />-602 <br />-1.71 <br />-969 <br />100% <br />-9.69 <br />Jul -13 <br />-1.61 <br />-5.72 <br />-2.37 <br />-9.70 <br />100% <br />-9.70 <br />Au -13 <br />-1.76 <br />-537 <br />-2.78 <br />-9.91 <br />100% <br />-9.91 <br />Sep,1 3 <br />-2.29 <br />-507 <br />-2.69 <br />-10.05 <br />100% <br />-10.05 <br />Oct -13 <br />-1.72 <br />-3.36 <br />-2.21 <br />-7.29 <br />100% <br />-7.29 <br />Nov -13 <br />-2.04 <br />-3,12 <br />-1.61 <br />-6.77 <br />100% <br />-6.77 <br />Dec -13 <br />-129 <br />-1.13 <br />-1.06 <br />-3.48 <br />100% <br />-3.48 <br />TOTAL 2013 <br />-22.11 <br />-42.95 <br />-17.28 <br />-82.34 <br />-82.34 <br />Person Responsible for this plan <br />Lynn Mayer Shuils <br />303 286.2247 <br />(71 (B) !0) <br />REPLACEMENTS <br />Rural Ditch <br />Depletions <br />Rinn Valley <br />Phase 3 Pit <br />Deliveries <br />0.00 <br />18.46 <br />0.00 <br />14.91 <br />0.00 <br />10.75 <br />1 15 <br />1 10.77 <br />12.48 <br />0.00 <br />16.78 <br />000 <br />17.32 <br />0.00 <br />11.79 <br />0.38 <br />5.06 <br />6.85 <br />-0.14 <br />8.97 <br />2 15 <br />10.21 <br />2 17 <br />6.76 <br />60 11 <br />88 O6 <br />-2.19 <br />5.66 <br />-218 <br />7.69 <br />-2.15 <br />5.71 <br />-0.93 <br />7.25 <br />10.B4 <br />0.00 <br />15.67 <br />0.00 <br />16.72 <br />0.00 <br />11.55 <br />000 <br />5.00 <br />504 <br />-0.14 <br />7.43 <br />-2 15 <br />8.92 <br />-2.17 <br />5.65 <br />47.88 <br />53.36 <br />RIVER <br />BALANCE <br />0.00 <br />0.00 <br />0.00 <br />000 <br />1.49 <br />3.64 <br />4.84 <br />0.00 <br />000 <br />0.00 <br />000 <br />0.00 <br />997 <br />0.00 <br />000 <br />0.00 <br />000 <br />4.25 <br />598 <br />7.02 <br />1.63 <br />000 <br />coo <br />0.00 <br />0.00 <br />18 89 <br />Notes, <br />1. See Table 5, Column (14). <br />2 See Table 6. Column (17). <br />3. See Table 7. Column (15). <br />4 Equal to (1) + (2) + (3). <br />5. Percent of month with call placed downstream of pits based on Water Division 1 records. - Accounting values based on actual recorded calls. <br />6. Equal to (4) - (5). <br />7. Historical lagged depletions associated with dry up Of land under Rural Ditch associated with recorded augmentation station dehvenes of 1 share(s) in <br />2012 and 1 shares) in 2013 summarized in Table 12. Return How obligations (negative values) are multiplied by portion of month with call (5) <br />8 Based on reusable supplies stored in lined Phase 3 cell at Rinn Valley. L.G. Everist's total use of Phase 3 Pit releases summarized in Table 12. <br />9. Equal to (6) + (7) + (8). Negative values ( -) represent net depletions to river system. Positive values ( +) represent net accretions to river system <br />cv...+ w... �uoc ..�..rtsrnrr.ucr..m.mr.�...nu rorr aw+n.w.� <br />
The URL can be used to link to this page
Your browser does not support the video tag.