Mr. Rick Parsons, P.E. <br />L.G. Everist Combined SWSP Amendment 1 <br />Page 3 of 9 <br />May 28, 2013 <br />site will not authorize any additional use of ground water until the Applicant provides documentation that a <br />bond sufficient to cover lining or backfilling of each pit has been obtained. The current bond amount for <br />each pit is shown in Table C below. <br />TABLE C - DRMS Bonding <br />Site Name <br />DRMS # <br />Bond Amount <br />Notes <br />Lohmann Pit <br />M- 2001 -017 <br />$665,800 <br />Rinn Valley Pit <br />M- 1997 -093 <br />$114,700 <br />Bond to be reassessed with forthcoming <br />amendment. <br />Firestone Pit <br />M- 1996 -052 <br />$509,900 <br />2013 <br />Fort Lupton Pit <br />M- 1999 -120 <br />$2,002,400 <br />2013 <br />Lupton Meadows Pit <br />M- 2002 -104 <br />N/A <br />Pit (and bond) now covered under <br />M- 1999 -120 <br />Depletions <br />The depletions resulting from evaporation, water lost in product, dust control and concrete <br />production are shown in Table D below: <br />TABLE D - DEPLETION SUMMARY <br />Site Name <br />Evaporation <br />Loss <br />(ac -ft) <br />Product <br />Moisture Loss <br />(ac -ft) <br />Dust Control <br />( ) ac -ft <br />Concrete <br />Production <br />(ac -ft) <br />Total <br />Depletions <br />(ac -ft) <br />Total Net <br />Depletions " "* <br />(ac -ft) <br />2012 <br />2013 <br />2012 <br />2013 <br />2012 <br />2013 <br />2012 <br />2013 <br />2012 <br />2013 <br />2012 <br />2013 <br />Lohmann Pit <br />10.0 <br />10.0 <br />3.8 <br />4.4 <br />1.0 <br />1.0 <br />0.0 <br />0.0 <br />14.8 <br />15.4 <br />54.2 <br />22.1 <br />Rinn Valley Pit <br />14.1 <br />14.1 <br />13.9 <br />14.6 <br />1.0 <br />1.0 <br />12.3* <br />13.0 ** <br />41.3 <br />42.7 <br />66.7 <br />43.0 <br />Firestone Pit <br />17.3 <br />17.3 <br />0.0 <br />0.0 <br />0.0 <br />0.0 <br />0.0 <br />0.0 <br />17.3 <br />17.3 <br />-17.3 <br />-17.3 <br />St. Wain Creek Net Depletions <br />138.2 <br />82.3 <br />Fort Lupton Pit <br />11.4 <br />11.4 <br />0.0 <br />0.0 <br />0.0 <br />0.0 <br />0.0 <br />0.0 <br />11.4 <br />11.4 <br />62.0 <br />32.6 <br />Lupton <br />Meadows Pit <br />17.9 <br />17.9 <br />31.6 <br />32.9 <br />1.0 <br />1.0 <br />0.0 <br />0.0 <br />50.5 <br />51.8 <br />73.4 <br />53.3 <br />South' Platte Rive_ r Net Depletions <br />135.4 <br />85.9 <br />" Based on 80,000 tons of concrete production and 50 gallons of water per ton of concrete <br />** Based on 85,000 tons of concrete production and 50 gallons of water per ton of concrete <br />The total net depletions include accretions credits or depletions from dewatering. The total net depletions for 2010 and 2011 <br />for all pits were taken from Tables 8 and 11 <br />The net evaporation for the Firestone Pit includes a credit of 0.60 acre -feet of consumptive use of <br />ground water associated with the partial subirrigation of the historically irrigated acreage. No other <br />phreatophyte credit was applied to the other sites. Computation of evaporation under this plan was <br />reduced during the ice covered periods. You have assumed the ice covered period to occur during the <br />months of December, January and February, based on average monthly temperatures less than 32 °F <br />taken from the Longmont 2ESE weather station for the Saint Wain Pits and Fort Lupton 2SE station for <br />the South Platte Pits. However, for the purpose of this SWSP, the Applicant shall replace the net <br />evaporation depletions from the exposed ground water surface area that may occur during the assumed <br />