Laserfiche WebLink
COLORADO <br />OIV ISION OF <br />RECLAMATION <br />MINING <br />SAFETY <br />Task description: SR01 Cost Summary <br />Site: Byzantine Quarry <br />PROJECT IDENTIFICATION <br />COST SUMMARY WORK <br />Permit Action: SRO <br />Task #: 000 State: Colorado <br />Date: 5/7/2013 County: Fremont <br />User: TC 1 <br />Agency or organization name: DRMS <br />TASK LIST (DIRECT COSTS) <br />Permit/Job #: M2007014 <br />Abbreviation: None <br />Filename: M014 -000 <br />Task <br />Description <br />Form <br />Used <br />Fleet <br />Size <br />Task <br />Hours <br />Cost <br />101 <br />Regrade Portions of Site to 10% Slopes -Only <br />DOZER <br />2 <br />53.30 <br />$22,493.28 <br />Portions to Rev <br />$9,858.59 <br />CONTRACT AMOUNT (direct + O & P) = <br />$85,287.68 <br />Reapply Topsoil to Portions of Site to be <br />DOZER <br />15.39 <br />102 <br />2 <br />$6,496.87 <br />Reve etated <br />Reveg Portions of the Site (TRO1 revised seed <br />REVEGE <br />0.00 <br />103 <br />1 <br />$37,618.35 <br />mix) <br />Removal of out - buildings <br />DEMOLISH <br />0.00 <br />104 <br />1 <br />$6,056.13 <br />Mobilize/Demobilize Equipment <br />MOBILIZE <br />2.30 <br />105 <br />1 <br />$2,764.46 <br />SUBTOTALS: <br />70.99 <br />$75,429.09 <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT: <br />Liability insurance: <br />Performance bond: <br />Job superintendent: <br />Profit: <br />2.02% <br />Total = <br />$1,523.67 <br />1.05% <br />Total = <br />$792.01 _ <br />0.00 hrs <br />Total = <br />$0.00 <br />10.00% <br />Total = <br />$7,542.91 _ <br />TOTAL O & P = <br />$9,858.59 <br />CONTRACT AMOUNT (direct + O & P) = <br />$85,287.68 <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT: <br />Financial warranty processing (legal/related costs): <br />Engineering work and/or contract/bid preparation: <br />Reclamation management and /or administration: <br />500.00 <br />0.00% <br />5.00% <br />CONTINGENCY: 0.00 <br />Total = 500.00 <br />Total = $0.00 <br />$4,264.38 <br />Total = $0.00 <br />TOTAL INDIRECT COST = $14,622.97 <br />TOTAL BOND AMOUNT (direct + indirect) = $90,052.06 <br />