My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-05-28_HYDROLOGY - M1977344
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M1977344
>
2013-05-28_HYDROLOGY - M1977344
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:20:46 PM
Creation date
5/29/2013 8:59:26 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977344
IBM Index Class Name
HYDROLOGY
Doc Date
5/28/2013
Doc Name
March 2013 Groundwater Monitoring Report
From
ARCADIS
To
DRMS
Permit Index Doc Type
Hydrology Report
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Portland Plant Holcim (US) Inc. Phone 719 784 6325 <br />• 3500 Highway 120 Fax 719 784 3470 <br />H O �' Florence, CO 81226 www.holam.com /us <br />July 7, 2010 <br />Mr. Berhan Keffelew <br />Colorado Department of Natural Resources <br />Division of Reclamation, Mining and Safety <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203 <br />Re: Proposed Groundwater Monitoring Plan, DRMS Permit M- 1977 -344 <br />Dear Mr. Keffelew, <br />The purpose of this groundwater monitoring plan (GMP) is to fulfill the requirements of <br />Technical Revision #6 (TR -06) to the Division of Mining, Reclamation and Safety Permit M- <br />1977 -344. This permit is for the Holcim (US) Portland Plant quarry located adjacent to the <br />cement plant in Florence, Colorado. The quarry is located on the north side of the Arkansas <br />River. Groundwater in the area flows in a generally southerly direction toward the river. <br />Holcim proposes annual sampling of the following monitoring wells: <br />• MW -12 - Background well located in the north end of the quarry. <br />• MW -7 - Compliance well located in the southwest area of the quarry (approximately Y4 <br />mile inside the quarry main entrance). <br />• MW -13 - Compliance well located in the southeast area of the quarry, approximately 100 <br />feet north west of the intersection of State Highway 120 and Bear Creek (approximately <br />'/ mile east of the main quarry entrance). <br />In addition, Holcim will continue monitoring water level in wells P -2, P -3, MW -9, and MW -11. <br />Holcim proposes monitoring for the following parameters: <br />• Total Dissolved Solids (TDS) <br />• Sulfate (SO4) <br />• Potassium (K) <br />• Sodium (Na) <br />• Iron (Fe) <br />• Manganese (Mn) <br />In addition, the following field parameters will be recorded. <br />• pH <br />• specific conductance <br />• temperature <br />
The URL can be used to link to this page
Your browser does not support the video tag.