My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-05-10_REVISION - M2000030
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2000030
>
2013-05-10_REVISION - M2000030
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:41:27 AM
Creation date
5/29/2013 8:48:27 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2000030
IBM Index Class Name
REVISION
Doc Date
5/10/2013
Doc Name
FW Increase
From
DRMS
To
Elam Construction, Inc.
Type & Sequence
SI1
Email Name
KAP
GRM
BJC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BULLDOZER RIPPING WORK <br />Task description: —Rip Compaction on Pit Floor <br />Site: AGRI -DLD Gravel Pit Permit Action: 2013 Inspection Permit/Job #: M2000030 <br />PROJECT IDENTIFICATION <br />Task #: 004 State: Colorado Abbreviation: None <br />Date: 5/7/2013 County: La Plata Filename: M030 -004 <br />User: KAP <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: Cat D9T - 9SU Horsepower: 405 <br />Ripper Attachment: 3 -Shank Ripper Shift Basis: 1 per day <br />Data Source: (CRG) <br />Cost Breakdown: <br />Unit cost: $363.457 Per acre <br />Total job cost: $14,538.00 <br />CIRCES Cost Estimating Software <br />Utilization % <br />Ownership Cost/Hour: <br />$78.33 <br />NA <br />Operating Cost/Hour: <br />$142.13 <br />100 <br />Ripper Operating Cost/Hour: <br />$7.96 <br />100 <br />Operator Cost/Hour: <br />$37.41 <br />NA <br />Total Unit Cost/Hour: <br />$265.84 <br />Total Fleet Cost/Hour: <br />$265.84 <br />MATERIAL QUANTITIES <br />Selected estimating method: Area <br />Alternate Methods: <br />Seismic: NA Bank Volume: NA <br />BCY NA <br />Area: 40.00 acres Rip Depth (ft): 1.50 <br />Volume: 96,800 BCY or CCY <br />Source of estimated quantity: <br />Reclamation Plan <br />HOURLY PRODUCTION <br />Seismic: <br />Seismic Velocity: <br />NA <br />feet/second <br />Area: <br />Average Ripping Depth: <br />2.63 <br />mph <br />Average Ripping Width: <br />7.67 <br />degrees <br />Average Ripping Length: <br />400.00 <br />feet <br />Average Dozer Speed: <br />88.00 <br />feet <br />Average Maneuver Time: <br />0.25 <br />feet <br />Production per unit area: <br />0.881 <br />acres/hour <br />Job Condition Correction Factors <br />Unadjusted Hourly Unit Production: <br />0.881 <br />Acres/hr <br />Site Altitude: <br />6,600 <br />feet <br />Altitude Adj: <br />1.00 <br />(CAT HB) <br />Job Efficiency: <br />0.83 <br />(1 shift/day) <br />Net Correction: <br />0.83 <br />multiplier <br />Adjusted Hourly Unit Production: 0.73 <br />Acres/hr <br />Adjusted Hourly Fleet Production: 0.73 <br />Acres/hr <br />JOB TIME AND COST <br />Fleet size: 1 Grader(s) <br />Total job time: <br />54.69 Hours <br />Unit cost: $363.457 Per acre <br />Total job cost: $14,538.00 <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.