Laserfiche WebLink
Mobilization Worksheet Cont'd Task # 009 Page 2 of 2 <br />EOUIPMENT HAUL DISTANCE and Time <br />Nearest Major City or Town within project area region: <br />DURANGO <br />Total one -way travel distance: <br />15.00 miles <br />Average Travel Speed: <br />50.00 mph <br />Total Non - Roadable Mob/Demob Cost * <br />`* <br />$2,676.74 <br />two round trips with haul rig: <br />NA <br />Total Roadable Mob/Demob Cost ** <br />$124.90 <br />* * one round trip, no haul rig: <br />Transportation Cycle Time: <br />Haul Time (Hours): <br />Return Time (Hours): <br />Loading Time (Hours): <br />Unloading Time (Hours): <br />Subtotals: <br />JOB TIME AND COST <br />Non - Roadable <br />Equipment <br />Roadable <br />Equipment <br />0.30 <br />0.30 <br />0.30 <br />0.30 <br />1.00 <br />NA <br />1.00 <br />NA <br />2.60 <br />0.60 <br />Total job time <br />5.20 Hours <br />Total job cost: $2,801.64 <br />CIRCES Cost Estimating Software <br />