My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-05-10_REVISION - M2000030
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2000030
>
2013-05-10_REVISION - M2000030
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:41:27 AM
Creation date
5/29/2013 8:48:27 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2000030
IBM Index Class Name
REVISION
Doc Date
5/10/2013
Doc Name
FW Increase
From
DRMS
To
Elam Construction, Inc.
Type & Sequence
SI1
Email Name
KAP
GRM
BJC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task description: 2013 Inspect <br />Site: AGRI -DLD Gravel Pit <br />PROJECT IDENTIFICATION <br />COST SUMMARY WORK <br />Permit Action: 2013 Inspection Permit/Job #: M2000030 <br />Task #: 000 State: Colorado <br />Date: 5/7/2013 County: La Plata <br />User: KAP <br />Agency or organization name: DRMS <br />TASK LIST (DIRECT COSTS) <br />Abbreviation: None <br />Filename: M030 -000 <br />Task <br />Descri tion <br />Form <br />Used <br />Fleet <br />Size <br />Task <br />Hours <br />Cost <br />001 <br />002 <br />003 <br />004 <br />005 <br />006 <br />008 <br />009 <br />Reduce Hi walls to 2:1 <br />DOZER <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />43.80 <br />$11,295.28 <br />$9,117.19 <br />$12,483.73 <br />$14,538.00 <br />$637.95 <br />$12,570.40 <br />$41,046.24 <br />$2,801.64 <br />Push Overburden Downslo e, Create 3:1 <br />DOZER <br />35.36 <br />Grade Pit Floor <br />DOZER <br />48.41 <br />Rip Compaction on Pit Floor <br />RIPPER <br />54.68 <br />Spread Topsoil on Slopes <br />DOZER <br />2.47 <br />Load and Carry Topsoil from Stockpile to Pit Floor <br />TRUCKI <br />58.88 <br />Reve etate <br />REVEGE <br />40.00 <br />Mobilize/Demobilize <br />MOBILIZEF—I <br />5.20 <br />SUBTOTALS: <br />288.8 <br />$104,490.43 <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT: <br />Liability insurance: <br />Performance bond: <br />Job superintendent: <br />Profit: <br />0.00% <br />Total = <br />$0.00 <br />0.00% <br />Total = <br />$0.00 <br />144.40 hrs <br />Total = <br />$9,445.20 <br />10.00% <br />Total = <br />$10,449.04 <br />TOTAL O & P = <br />$19,894.24 <br />CONTRACT AMOUNT (direct + O & P) = <br />$124,384.67 <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT: <br />Financial warranty processing (legal/related costs): <br />Engineering work and/or contract/bid preparation: <br />Reclamation management and/or administration: <br />500.00 <br />8.00% <br />5.81% <br />CONTINGENCY: 0.00 <br />Total = 500.00 <br />Total = $9,950.77 <br />$7,226.75 <br />Total = $0.00 <br />TOTAL INDIRECT COST = $37,571.76 <br />TOTAL BOND AMOUNT (direct + indirect) = $142,062.19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.