Laserfiche WebLink
Pagel of 3 <br />TRUCK/LOADER TEAM WORK <br />Task description: Load and Carry Topsoil from Stockpile to Pit Floor <br />Site: AGRI -DLD Gravel Pit Permit Action: 2013 Inspection Permit/Job #: M2000030 <br />PROJECT IDENTIFICATION <br />Task #: 006 State: Colorado <br />Date: 5/7/2013 County: La Plata <br />User: KAP <br />Agency or organization name <br />HOURLY EQUIPMENT COST <br />DRMS <br />Equipment Descri tion <br />Truck Loader Team - Truck: Generic 8 -10 c , 6x4 <br />- Loader: CAT 938H high lift <br />Support Equipment -Load Area: NA <br />-Dump Area: NA <br />Road Maintenance —Motor Grader: NA <br />-Water Truck: NA <br />Abbreviation: None <br />Filename: M030 -006 <br />Shift basis: I per day <br />Cost Breakdown: Truck/Loader Team Sunnort Eauinment Maintenance F.auinment <br />Total work team cost/hour: $213.49 <br />MATERIAL OUANTITIES <br />Initial volume: 17,600 CCY Swell factor: 1.125 <br />Loose volume: 19,800 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00 <br />HOURLY PRODUCTION <br />Truck Capacity: <br />Truck Payload (weight) Basis: <br />Material weight: 2,550 Pounds /LCY <br />Description: Earth - Dry packed <br />Rated Payload: 27,280 Pounds <br />Payload Capacity: 10.70 LCY <br />CIRCES Cost Estimating Software <br />Truck <br />Loader <br />Load Area <br />Dump Area <br />Motor Grader <br />Water Truck <br />%Utilization- machine: <br />100 <br />100 <br />NA <br />NA <br />NA <br />NA <br />Ownership cost/hour: <br />$8.92 <br />$21.45 <br />NA <br />NA <br />NA <br />NA <br />Operating cost/hour: <br />$50.32 <br />$37.75 <br />NA <br />NA <br />NA <br />NA <br />Ripper op. cost/hour: <br />NA <br />$0.00 <br />NA <br />NA <br />NA <br />NA <br />Operator cost/hour: <br />$0.00 <br />$35.82 <br />NA <br />NA <br />NA <br />NA <br />Unit Subtotals: <br />$59.24 <br />$95.01 <br />NA <br />NA <br />NA <br />NA <br />Number of Units: <br />2 <br />1 <br />0 <br />0 <br />0 <br />0 <br />Group Subtotals: <br />Work: $213.49 <br />Support: $0.00 <br />Maint: $0.00 <br />Total work team cost/hour: $213.49 <br />MATERIAL OUANTITIES <br />Initial volume: 17,600 CCY Swell factor: 1.125 <br />Loose volume: 19,800 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00 <br />HOURLY PRODUCTION <br />Truck Capacity: <br />Truck Payload (weight) Basis: <br />Material weight: 2,550 Pounds /LCY <br />Description: Earth - Dry packed <br />Rated Payload: 27,280 Pounds <br />Payload Capacity: 10.70 LCY <br />CIRCES Cost Estimating Software <br />