Laserfiche WebLink
Bulldozer Worksheet Cont'd Task # 002 Page 2 of 2 <br />Visibility: <br />Job efficiency: <br />Spoil pile: <br />Push gradient: <br />Altitude: <br />Material Weight: <br />Blade type: <br />1.000 <br />(AVG.) <br />0.830 <br />(1 SHIFT /DAY) <br />0.800 <br />(SSD -AC) <br />1.000 <br />(CAT HB) <br />1.000 <br />(CAT HB) <br />0.708 <br />(CAT HB) <br />1.000 <br />(PAT) <br />Net correction: 0.3173 <br />Adjusted unit production: <br />Adjusted fleet production: <br />JOB TIME AND COST <br />444.22 LCY/hr <br />444.22 LCY/hr <br />Fleet size: 1 Dozer(s) <br />Unit cost: $0.475/LCY <br />Total job time: 12.51 Hours <br />Total job cost: $2,638.84 <br />CIRCES Cost Estimating Software <br />