My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-05-22_REVISION - M1987064
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1987064
>
2013-05-22_REVISION - M1987064
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:41:27 AM
Creation date
5/29/2013 8:48:11 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1987064
IBM Index Class Name
REVISION
Doc Date
5/22/2013
Doc Name
FW Increase
From
DRMS
To
Elam Construction, Inc. dba Sandco, Inc.
Type & Sequence
SI1
Email Name
KAP
THM
GRM
BJC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mobilization Worksheet Cont'd Task # 013 Page 2 of 2 <br />EQUIPMENT HAUL DISTANCE and Time <br />Nearest Major City or Town within project area region: <br />DURANGO <br />Total one -way travel distance: <br />7.00 miles <br />Average Travel Speed: <br />40.00 mph <br />Total Non - Roadable Mob/Demob Cost <br />$2,464.87 <br />`* two round trips with haul rig: <br />NA <br />Total Roadable Mob/Demob Cost ** <br />$72'86 <br />** one round trip, no haul rig: <br />Transportation Cycle Time: <br />Haul Time (Hours): <br />Return Time (Hours): <br />Loading Time (Hours): <br />Unloading Time (Hours): <br />Subtotals: <br />JOB TIME AND COST <br />Non - Roadable <br />Equipment <br />Roadable <br />Equipment <br />0.18 <br />0.18 <br />0.18 <br />0.18 <br />1.00 <br />NA <br />1.00 <br />NA <br />2.35 <br />0.35 <br />Total job time: 4.70 Hours <br />Total job cost: $2,537.73 <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.