Laserfiche WebLink
Truck/Loader Worksheet Cont'd Task # 009 Page 3 of 3 <br />Haul Route: <br />Seg # <br />Haul Distance <br />Grade ( %) <br />Roll. Res <br />Total Res <br />Velocity <br />Travel <br />(Ft) <br />( %) <br />(%) <br />(fpm) <br />Time <br />min <br />1 <br />30.00 <br />0.00 <br />5.00 <br />5.00 <br />2218 <br />0.083 <br />Haul Time: <br />Return Route: <br />0.083 <br />minutes <br />Seg # <br />Haul Distance <br />Grade ( %) <br />Roll. Res <br />Total Res <br />Velocity <br />Travel <br />(Ft) <br />( %) <br />( %) <br />(fpm) <br />Time <br />min <br />1 <br />30.00 <br />0.00 <br />5.00 <br />5.00 <br />2814 <br />0.039 <br />Loading Tool unit <br />Production 525.00 <br />Truck Unit Production <br />Optimal No. of Trucks: 3 <br />Return Time: 0.039 <br />Total Truck Cycle Time: 1.522 <br />LCY/Hour Adjusted for job efficiency: <br />LCY/Hour Adjusted for job efficiency: <br />Truck(s) Selected Number of Trucks: <br />Adjusted hourly truck team production: 343.56 <br />Adjusted single truck/loader team production: 343.56 <br />Adjusted multiple truck/loader team production: 343.56 <br />JOB TIME AND COST <br />Fleet size: 1 Team(s) Total job time: 1.60 <br />Unit cost: $0.729 /LCY Total job cost: $400.73 <br />minutes <br />minutes <br />5.75 LCY/Hour <br />1.78 LCY/Hour <br />2 Truck(s) <br />LCY/Hour <br />LCY/Hour <br />LCY/Hour <br />Hours <br />CIRCES Cost Estimating Software <br />