My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-05-22_REVISION - M1987064
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1987064
>
2013-05-22_REVISION - M1987064
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:41:27 AM
Creation date
5/29/2013 8:48:11 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1987064
IBM Index Class Name
REVISION
Doc Date
5/22/2013
Doc Name
FW Increase
From
DRMS
To
Elam Construction, Inc. dba Sandco, Inc.
Type & Sequence
SI1
Email Name
KAP
THM
GRM
BJC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task description: SO -01 <br />Site: Dillon Ranch Pit <br />PROJECT IDENTIFICATION <br />COST SUMMARY WORK <br />Permit Action: SO -01 <br />Task #: 000 State: Colorado <br />Date: 5/21/2013 County: La Plata <br />User: KAP <br />Agency or organization name: DRMS <br />TASK LIST (DIRECT COSTS) <br />Permit/Job #: M1987064 <br />Abbreviation: None <br />Filename: M064 -000 <br />Task <br />Description <br />Form <br />Used <br />Fleet <br />Size <br />Task <br />Hours <br />Cost <br />001 <br />002 <br />003 <br />004 <br />005 <br />006 <br />007 <br />008 <br />009 <br />010 <br />011 <br />012 <br />013 <br />Remove structures and debris <br />DEMOLISH <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />5.00 <br />$2,766.41 <br />$2,638.84 <br />$408.32 <br />$1,726.03 <br />$638.00 <br />$1,602.93 <br />$758.27 <br />$160.00 <br />$400.73 <br />$189.57 <br />$954.00 <br />$7,001.24 <br />$2,537.73 <br />Grade Affected River Channel, remove haul road <br />and dikes <br />DOZER <br />12.51 <br />Stabilize affected river bank <br />REVEGE <br />5.00 <br />Reduce Temporary Highwall to Final Sloe <br />DOZER <br />8.44 <br />Load topsoil for hauling to pond banks <br />LOADER <br />4.84 <br />Haul Topsoil for Pond Banks <br />TRUCKI <br />6.40 <br />Spread Topsoil on Upper Slopes <br />DOZER <br />3.71 <br />Load topsoil for hauling for road area <br />LOADER <br />1.21 <br />Haul Topsoil for Road <br />TRUCKI <br />1.60 <br />Spread Topsoil n Haul Road <br />DOZER <br />0.93 <br />Rip compacted stockpile and haul areas <br />RIPPER <br />4.52 <br />Reve etation 7.6 acres <br />REVEGE <br />8.00 <br />Mobilize <br />MOBILIZE <br />4.70 <br />SUBTOTALS: <br />66.86 <br />$21,782.07 <br />INDIRECT COSTS <br />500.00 Total = <br />OVERHEAD AND PROFIT: <br />Engineering work and/or contract/bid preparation: <br />Liability insurance: <br />0.00% <br />Performance bond: <br />0.00% <br />Job superintendent: <br />33.43 hrs <br />Profit: <br />10.00% <br />Total = <br />Total = <br />Total = <br />Total = <br />TOTAL O &P= <br />CONTRACT AMOUNT (direct + O & P) = <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT: <br />$0.00 <br />$0.00 <br />$2,186.66 <br />$2,178.21 <br />$4,364.87 <br />$26,146.94 <br />Financial warranty processing (legal/related costs): <br />500.00 Total = <br />500.00 <br />Engineering work and/or contract/bid preparation: <br />10.00% Total = <br />$2,614.69 <br />Reclamation management and/or administration: <br />7.10% <br />$1,856.43 <br />CONTINGENCY: <br />0.00 Total = <br />$0.00 <br />TOTAL INDIRECT COST = <br />$9.336.00 <br />TOTAL BOND AMOUNT (direct + indirect) = $31,118.07 <br />
The URL can be used to link to this page
Your browser does not support the video tag.