Laserfiche WebLink
Loader Worksheet Cont'd Task # 005 <br />Total Travel Time: 0.0526 <br />Total Cycle Time: 0.6026 <br />Load Bucket Capacity <br />Rated Capacity: 5.00 LCY (heaped) <br />Bucket Fill Factor: 1.100 Other - rock/dirt mixtures (100 -120 %) 1.100 <br />Adjusted Capacity: 5.50 LCY <br />Job Condition Correction Factors <br />Site Altitude: 6580 feet <br />Source <br />Altitude Adj: 1.00 (CAT HB) <br />Job Efficiency: 0.83 T (1 shift/day) <br />Net Correction: 0.83 multiplier <br />Unadjusted Hourly Unit Production: 547.60 <br />Adjusted Hourly Unit Production: 454.51 <br />Adjusted Hourly Fleet Production: 454.51 <br />JOB TIME AND COST <br />Fleet size: 1 Loader(s) Total job time: <br />Unit cost: $0.290 /LCY Total job cost: <br />LCY/Hour <br />LCY/Hour <br />LCY/Hour <br />4.84 <br />$638.00 <br />Page 2 of 2 <br />minutes <br />minutes <br />Hours <br />CIRCES Cost Estimating Software <br />