Laserfiche WebLink
6 (FORM 2 - Public filing) <br />8. Describe the estimated topsoil depth and how topsoil will be salvaged, stockpiled and redistributed for the re- establishment of <br />vegetation. Specify approximate topsoil redistribution depth: <br />I I be ; -� 1&0 <1 rlG -•h C) 7 / V <br />9. Describe how drill holes will be plugged (refer to Rule 5.4 of the Rules for required abandonment procedures): <br />fhe, -,c-- k_� /' // ,, &, a J o,;// Yo %s <br />10. Describe how portals, adits, shafts, ponds, excavations, or other disturbances will be reclaimed (refer to Rule 3 and Rule 5 for <br />specific reclamation performance standards). You may wish to contact the Division for closure specifications. <br />a��k- d ;StAvbmce -S CC i_i �'o RcCAz;P­� <br />11. Describe how roads will be reclaimed or returned to their pre - prospecting (or better) condition: <br />a,-7Y , P1 <br />