Laserfiche WebLink
5731 State Highway 13 <br />May 22, 2013 <br />COAL <br />,,. CONPAN °4 <br />.�o�s.raoan� °� <br />Meeker, Colorado 81641 <br />Mr. Rob Zuber <br />Environmental Protection Specialist <br />Colorado Division of Reclamation, Mining & Safety <br />Department of Natural Resources <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203 <br />♦ 970- 824 -1200 <br />RECEIVED <br />MAY 242013 <br />M"Oly AN p CLA14, T'ON <br />ETY <br />RE: Colowyo Coal Company L.P., Mine Permit C -81 -019, Minor Revision <br />No. 126 (MR -126), Cumulative Bond Schedule <br />Dear Mr. Zuber, <br />Enclosed please find two copies of minor revision (MR) 126. MR -126 revises <br />Volume 13 with incorporation of Exhibit 13B Cumulative Bond Schedule. Under <br />permit renewal (RN) 06 Colowyo was required to submit a bond rider to cover the <br />increase in reclamation liability from approval of RN -06, or submit a cumulative <br />bond schedule within 45 days of the approval of RN -06. Enclosed Colowyo is <br />submitting information for a cumulative bond schedule within the 45 days as <br />required by Stipulation 14. <br />Also included with this package are a revision application and a change of index <br />sheet to ease incorporation into the permit document. If you should have any <br />additional questions or concerns please feel free to contact Tony Tennyson at (970) <br />824 -1232. <br />Sincerely, <br />Chris McCourt <br />Mine Manager <br />Encl. <br />Cc: file CF 1.1.1.114 <br />A paining property of Western Fuels - Colorado, A Limited Liability Company <br />