Laserfiche WebLink
1EXHIBIT 13B <br />CUMULATIVE BOND SCHEDULE <br />Introduction <br />Under the approval of RN-06, Stipulation 14 was issued in which Colowyo is required to submit <br />a bond rider or a minor revision containing a cumulative bond schedule. This Exhibit 13B <br />Tracking and RgRorting Plan <br />Colowyo will track all actual mine plan volumes on a monthly basis and will submit this <br />information in a quarterly report to the Division. These quarterly reports will outline the material <br />movement mentioned above for the quarter versus the total planned material movement for the <br />year. <br />Pagel3B-1 Revision Date: 5/22/13 <br />Revision No.: MR-125 <br />