My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-05-23_REVISION - X200415313
DRMS
>
Day Forward
>
Revision
>
Minerals
>
X200415313
>
2013-05-23_REVISION - X200415313
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:20:43 PM
Creation date
5/28/2013 7:39:22 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
X200415313
IBM Index Class Name
Revision
Doc Date
5/23/2013
Doc Name
Proposed Decision Letter & Cost Estimate
From
DRMS
To
Central Appalachia Mining, LLC
Type & Sequence
SL1
Email Name
ERR
JDM
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task description: <br />CAM Stove Canyon Expl <br />Site: Proiect <br />BULLDOZER WORK <br />Drill Pads <br />Permit Action: <br />SL1 <br />PROJECT IDENTIFICATION <br />Task #: 002 State <br />Date: 5/23/2013 County <br />User: ERR <br />Colorado <br />Garfield <br />Agency or organization name: DRMS <br />HOURLY EOUIPMENT COST <br />Basic Machine: <br />Cat D6T <br />Horsepower: <br />185 <br />Blade Type: <br />Semi - Universal <br />Attachment: <br />NA <br />Shift Basis: 1 per day <br />Data Source: (CRG) <br />Cost Breakdown: <br />Page 1 of 2 <br />Permit/Job #: X200415313 <br />Abbreviation: None <br />Filename: X153 -002 <br />Total unit Cost/Hour: $125.81 <br />Total Fleet Cost/Hour: $125.81 <br />MATERIAL QUANTITIES <br />Initial Volume: <br />Utilization % <br />Ownership Cost/Hour: <br />$30.43 <br />Loose volume: <br />NA <br />Operating Cost/Hour: <br />$57.97 <br />100 <br />Ripper op. Cost/Hour: <br />$0.00 <br />0 <br />Operator Cost/Hour: <br />$37.41 <br />NA <br />Total unit Cost/Hour: $125.81 <br />Total Fleet Cost/Hour: $125.81 <br />MATERIAL QUANTITIES <br />Initial Volume: <br />993 <br />Swell factor: <br />1.125 <br />Loose volume: <br />1.117 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly production: <br />50 feet <br />444.6 LCY/hr <br />Materials consistency description: Compacted fill or embankment 0.9 <br />Average push gradient: <br />Average site altitude: <br />Material weight: <br />0% <br />6,600 feet <br />2.650 lbs/LCY <br />Weight description: Decomposed rock - 25% Rock, 75% Earth <br />Job Condition Correction Factor Source <br />Operator Skill: 0.750 (AVG.) <br />Material consistency: 0.900 (CAT HB)) <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.