Laserfiche WebLink
COST SUMMARY WORK <br />Task description: Cost Summary of Tasks Remaining Under NOI X200415313 <br />Site: CAM Stove Canyon Espl Project Permit Action: SL Permit /Job #: X200415313 <br />PROJECT IDENTIFICATION <br />Task #: 000 State: Colorado <br />Date: 5/23/2013 County: Garfield <br />User: ERR <br />Agency or organization name: DRMS <br />TASK LIST (DIRECT COSTS) <br />Abbreviation: None <br />Filename: X153 -000 <br />Task <br />Description <br />Form <br />Used <br />Fleet <br />Size <br />Task <br />Hours <br />Cost <br />001 <br />002 <br />003 <br />004 <br />005 <br />Seal and Abandon Remaining Water Monitoring <br />Wells <br />BOREHOLE <br />1 <br />1 <br />1 <br />1 <br />1 <br />15.00 <br />$7,964.10 <br />$812.65 <br />$18,117.03 <br />$5,652.94 <br />$668.95 <br />Regrade Drill Pads <br />DOZER <br />6.46 <br />Regrade Roads <br />DOZER <br />144.00 <br />Replace Topsoil on Drill Pads and Roads <br />DOZER <br />44.93 <br />Reseed Drill Pads and Roads <br />REVEGE <br />1.80 <br />SUBTOTALS: <br />212.19 <br />$33,215.67 <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT: <br />Liability insurance: 2.02% <br />Performance bond: 1.05% <br />Job superintendent: 0.00 hrs <br />Profit: 10.00% <br />Total <br />Total <br />Total <br />Total <br />TOTAL O & P <br />CONTRACT AMOUNT (direct + O & P) <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT <br />$670.96 <br />$348.76 <br />$0.00 <br />$3,321.57 <br />$4,341.29 <br />$37,556.96 <br />Financial warranty processing (legal /related costs): 0.00 Total = 0.00 <br />Engineering work and /or contract/bid preparation: 4.25% Total = $1,596.17 <br />Reclamation management and /or administration: 5.00% $1,877.85 <br />CONTINGENCY: 0.00 Total = $0.00 <br />TOTAL INDIRECT COST = $7,815.31 <br />TOTAL BOND AMOUNT (direct + indirect) = $41,030.98 <br />