Laserfiche WebLink
5/23/13 State.co.us Executive Branch Mail - Fwd: Bowie Eploration Inspection Reports <br />Russell - DNR, Elliott <elliott.russell @state.co.us> Thu, May 23, 2013 at 11:41 AM <br />To: Alysha Hernandez - DNR <alysha.hernandez @state.co.us> <br />W <br />have attached the two inspection reports from May 13th. The Division will be proposing to release the seismic <br />survey project's bond entirely and will wait until the two wells get transferred through TR78 to the permit before <br />partially releasing the bond for the spruce stomp project. <br />If you have any question, feel free to call or email me. <br />Thanks <br />s <br />303-866-3567 ext. 8147 <br />fax: 303-832-8106 <br />2 attachments <br />INSP REPORT X200521710.pdf <br />1736K <br />INSP REPORT X200621711.pdf <br />1083K <br />https: / /mail.g oog le.conVmai I /u /0 / ?ui =2 &i Ire29129fcb5 &view = pt &search =i nbox&th= 13ed27b6917c3al c 1 /1 <br />