Laserfiche WebLink
Exhibit D - Mining Plan <br />9.) The proposed affected area will not be in the Surveyor Creek. Material will be mined from the rangeland to the North <br />of the creek bank to 60 feet south of the fence separating the Railroad right -of -way and proposed site. Stockpiled material <br />will be outside the creek banks so as to protect the natural flow of the Surveyor Creek. We will mine to the approximate <br />same elevation as the surveyor Creek, which is 4,339 ft. above sea level. <br />10.) As recommended we will stabilize the topsoil stockpile with one of the recommended grass species <br />11.) The topsoil stockpile will placed along the northern edge of the proposed amended area, <br />12.) As recommended we will leave a 100 ft. buffer between the proposed mining are and Surveyor Creek as shown <br />below: <br />........... <br />Pit <br />�r� <br />