Laserfiche WebLink
Page 2 of 3 <br />and no cover material should be placed on Gob Pile 44 until TR -75 has been <br />approved. <br />In order to accommodate BRL's immediate need to begin placing cover material on Gob Pile <br />44, the Division placed the following stipulation on our approval of TR -75. <br />Stipulation 29 <br />Prior to placement of cover on the eastern portion of Gob Pile #4, BRL must survey the eastern <br />portion of the pile to verify that slopes are not steeper than 2:1 and regrade any slopes as <br />necessary to ensure conformity with the approved slope design. Documentation of the <br />corrected slopes must be submitted to and approved by the Division before cover can be placed <br />on the eastern portion of the disposal area. The area to be surveyed and regraded is depicted <br />on the February 8, 2013 review drawing submitted with the Technical Revision No. 75 <br />application. <br />On May 20, 2013, the Division received documentation that the slopes had been regraded to the <br />approved configuration. Accordingly, Stipulation 29 has been resolved by BRL and terminated <br />by the Division. Reclamation of Gob Pile #4 can now be completed as described in the <br />currently approved permit application package. <br />If you have any questions, please contact me. <br />Sincerely, <br />Susan L. Burgmmaier <br />Environmental Protection Specialist <br />cc: Tamme Bishop, J.E. Stover & Associates, Inc <br />