Doc Name
CQA REPORTS, WEEKS ENDING: 4/13/2013, 4/20/2013, 4/27/2013 & 5/4/2013
From
CC&V
To
DRMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
;cc <br />&V, <br />Secondary Underdrain: <br />No work was performed on the Secondary underdrain during this reporting period. <br />A total of 1380 feet of underdrain has been completed. <br />Primary Underdrain: <br />No work was performed on the Primary underdrain during this reporting period. <br />A total of 563 feet of Primary underdrain has been completed. <br />Tree /Slash Clearing, Chipping: <br />Seed Masters: No work during this reporting period. <br />B) Underground Workings <br />LTM__ <br />During the reporting period exploratory excavation and remediation were performed on UG working No. 6107, No. <br />6108, No. 6109, No. 6110, No. 6119, No. 6121, No. 6124, No. U6125, No. U6126, No. 6128 and No. 6129. The <br />sites were excavated to practical refusal into rock varying depths depending on the working remediated. The site <br />for each working was then backfilled in 2 foot loose lifts to approximate planned subgrade elevation using the onsite <br />structural fill (excavated material) and "bucket tamped" with the back of the CAT 330 excavator bucket. All backfill <br />material was free of organic material, ice and snow. <br />Confirmatory drilling continued during the reporting period on UG Working No. 6120 and No. 06122. All drill <br />locations were spaced on 4( + / -) foot centers and drilled to specified depth. Exploratory excavation will continue until <br />remediation has been performed. <br />C) Highway 67 <br />MHT #2 is in place and is working properly. No other work was performed for the existing HWY 67 crossing during <br />this reporting period. <br />11) Storm Water Management <br />A) Best Management Practices (BMP) are being performed. Inspections continue and there have been no <br />issues identified. <br />CQA ACTIVITIES: <br />1) Field Activities: Construction activities and observation of clearing and grubbing, VLF Phase I fill and compaction, <br />underground workings, HWY 67 embankment fill progress observation were some of the tasks performed in the field as <br />required per project specifications. <br />11) Laboratory Activities: Laboratory testing continued (Permeability, Particle Size Distribution, Atterberg Limits, <br />Moisture - Density, gradations and material identifications) were some of the laboratory testing performed during this <br />reporting period as required to project specifications. <br />General Proiect Items <br />Meetings and Discussions: None at this time. <br />Sum,nary of Concerns: Unsuitable Materials encountered within the PSSA limits are a concern. Discussions continue <br />regarding the materials encountered within the area. A sample has been obtained and is being evaluated at this time. Results <br />will be forwarded upon completion. <br />Please note: These materials are not being incorporated into any fills and will be evaluated to determine use following results. <br />Page 2 of 6 MLE2 WE 04.13.13.doc <br />