My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-05-20_REPORT - M1980244
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2013-05-20_REPORT - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:20:34 PM
Creation date
5/21/2013 3:54:42 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
5/20/2013
Doc Name
CQA REPORTS, WEEKS ENDING: 4/13/2013, 4/20/2013, 4/27/2013 & 5/4/2013
From
CC&V
To
DRMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
cc amec�` <br />Secondary Underdrain: <br />No work was performed on the Secondary underdrain during this reporting period. <br />A total of 1380 feet of underdrain has been completed. <br />Primary Underdrain: <br />An Amec field representative observed the Primary Under drain construction complete to the primary underdrain <br />ponds. In addition the cutoff wall was completed and installed per plans and specifications according to actual field <br />conditions during this reporting period. <br />A total of 863 feet of Primary underdrain has been completed. <br />Tree /Slash Clearing, Chipping: <br />Seed Masters began mobilizing to resume chipping process. Chipping is expected to resume during the next <br />reporting period. <br />B) Underground Workings <br />During the reporting period exploratory excavation was performed on UG working No. 6018, No. 6037 and No. <br />6051. These sites will continue with excavation into bedrock as remediation is completed as specified. <br />During this reporting period remediated sites were performed on UG working No. U6128, No. 6129, No. 6030, No. <br />U6131, No. 6037, No. 6047/U6019 No. 6049 and No. 6061. Sites listed were excavated to practical refusal into rock <br />varying depths depending on the working remediated. The site for each working was then backfilled in 2 foot loose <br />lifts to approximate planned subgrade elevation using the onsite structural fill (excavated material) and "bucket <br />tamped" with the back of the CAT 330 excavator bucket. All backfill material was free of organic material, ice and <br />snow. <br />Confirmatory drilling continued during the reporting period on UG Working No. 6123 and No. 6132. All drill locations <br />were spaced on 4( + / -) foot centers and drilled to specified depth. Exploratory excavation will continue until <br />remediation has been performed. <br />Q Highway 67 <br />MHT #2 is in place and is working properly. No other work was performed for the existing HWY 67 crossing during <br />this reporting period. <br />11) Storm Water Management <br />A) Best Management Practices (BMP) are being performed. Inspections continue and there have been no <br />issues identified. <br />CQA ACTIVITIES: <br />i) Field Activities: Construction activities and observation of clearing and grubbing, VLF Phase I fill and compaction, <br />underground workings, HWY 67 embankment fill progress observation were some of the tasks performed in the field as <br />required per project specifications. <br />11) Laboratory Activities: Laboratory testing continued (Permeability, Particle Size Distribution, Atterberg Limits, <br />Moisture - Density, gradations and material identifications) were some of the laboratory testing performed during this <br />reporting period as required to project specifications. <br />Pa.e 2 of 6 MLE2 WE 04.27.13.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.